Chile has no discharge standard written specifically for brine, and that gap shapes every brine valorization and ZLD decision a Chilean site makes. A coastal plant usually sends its brine to sea under the conditions of its environmental approval (RCA). An inland site that discharges to a river meets the chloride and sulfate limits of Decree 90 of 2000 (DS 90), and reverse osmosis concentrate soon breaks them. That split between coast and inland, more than any technology preference, decides whether a Chilean site can keep discharging, should concentrate its brine to a minimum (minimal liquid discharge, MLD), needs zero liquid discharge (ZLD), or has a case for recovering products from the brine.
The rules around brine are also moving. Chile’s desalination law, Ley 21.813, was published on 12 May 2026 and takes effect on 12 November 2027, 18 months later. The long-awaited decree replacing DS 90 was withdrawn from the Comptroller General’s review in March 2026, and we found no sign of it being resubmitted or published since. A bill to let industry reuse treated wastewater from submarine outfalls is still in the Senate.
This page is for non-mining industrial sites, desalination plant owners and developers, and water reuse projects in Chile. It is written by Brine Consulting, an independent industrial water advisory firm in Amsterdam. We sell no treatment equipment, so we have no plant to steer you towards, whether the answer turns out to be discharge, concentration or recovery. We take on Chilean projects remotely or through a defined engagement.
Where a saline stream can go in Chile, and the limit that applies
| Discharge to | Rule | Chloride | Sulfate | Salinity or TDS | What it means in practice |
|---|---|---|---|---|---|
| River, no dilution capacity | DS 90/2000, Table 1 | 400 mg/L | 1,000 mg/L | Not a parameter | At 75% RO recovery, any feed above 100 mg/L chloride gives a concentrate over this limit |
| River with dilution capacity | DS 90/2000, Table 2 | 2,000 mg/L | 2,000 mg/L | Not a parameter | Higher limits, but only where the river’s dilution capacity is recognised |
| Lake | DS 90/2000, Table 3 | Not listed | 1,000 mg/L | Not a parameter | Sulfate-rich brines are the constraint |
| Sea, inside or outside the littoral protection zone | DS 90/2000, Tables 4 and 5 | Not listed | Not listed | Not a parameter | Brine is controlled through RCA conditions, outfall design and monitoring; from 12 November 2027 desalination plants also fall under Ley 21.813 |
| Public sewer | DS 609/1998, Tables 3 and 4 | Not listed | 1,000 mg/L (1,500 if pH and temperature conditions are met) | Not a parameter | The utility must accept the flow; the Superintendencia de Servicios Sanitarios (SISS) is the competent authority |
Sources: DS 90/2000 text as collated by the maritime authority in August 2025 (Directemar TM-070 B); DS 609/1998 as amended in 2004 (FAO FAOLEX copy).
One clause matters for naturally saline water. Under DS 90, if the natural content of a parameter in the receiving water, or in water the site takes from that same water body, already exceeds the table limit, the permitted discharge equals that content. The water authority (DGA) or maritime authority (DGTM) determines it. Sites that draw naturally brackish water from the river they discharge to should check whether this applies before assuming the table value.
How far can RO recovery go before the reject breaks DS 90?
This is a hypothetical example for an inland site. It shows why river discharge rarely survives once a site starts recovering water.
Assumptions: well water with 250 mg/L chloride; reverse osmosis rejecting nearly all chloride, so the concentrate chloride is roughly the feed chloride divided by (1 minus recovery); discharge to a river under DS 90.
At 75% recovery, a common design point: 250 ÷ 0.25 = about 1,000 mg/L chloride in the reject, two and a half times the Table 1 limit.
The highest recovery that keeps the reject within Table 1 is 1 minus (250 ÷ 400) = 37.5%. Few sites would build RO for that.
Within Table 2, the ceiling is 1 minus (250 ÷ 2,000) = 87.5%, if the river’s dilution capacity is recognised.
The same rule of thumb works for sulfate with the 1,000 mg/L limit. Try your own feed and recovery in our brine concentration factor calculator.
Blending the reject with clean water to meet the limit is not a plan to rely on. The draft that was meant to replace DS 90 would prohibit diluting liquid waste with water from outside the industrial process (draft standard, Ministry of the Environment). The same draft keeps the river chloride and sulfate limits above and adds a 400 mg/L chloride limit for lakes, so in our view a future revision is unlikely to rescue an inland brine. The options we would look at are sewer discharge where the utility accepts it, trucking, or concentrating the brine: MLD or ZLD. Our MLD vs ZLD screener gives a first view of which fits.
Desalination brine: what Ley 21.813 changes and what it leaves open
Chile had 24 desalination plants producing more than 11,000 L/s when the law was promulgated, according to the industry association ACADES as cited by the water authority, and projects due in 2026 would add about 30% (DGA, 14 May 2026). Ley 21.813, published on 12 May 2026, gives that industry its own legal framework (summary, Actualidad Jurídica DOE). Concession terms, the drinking water share and the position of existing plants are set out on our desalination for mining in Chile page. For brine, four provisions matter:
Brine discharge points must be stated in the concession application, and the DGA’s technical report, whose conditions bind the ministry, rules on them. An unfavourable report means the application is rejected.
A National Desalination Strategy, drafted by the DGA and reviewed every six years, must identify bays where brine discharges should be avoided.
Environmental assessment: industrial-scale plants and intensive seawater extraction projects are added to the environmental impact assessment system (SEIA).
Timing: the law takes effect on 12 November 2027, 18 months after publication, except its chapter on the National Desalination Strategy. Most implementing regulations are due within a year of publication. Existing concessions keep their conditions for the rest of their term.
What the law does not do is set a technical standard for brine. The Ministry of the Environment may issue an emission standard but is not obliged to, and the law has no specific rule for the cumulative effect of several plants on one coastline, as researchers quoted by Mongabay Latam point out (Ingeciv, 29 September 2026). A legal review in 2020 had already found no Chilean standard regulating brine disposal or a maximum salt concentration (Cornejo-Ponce et al., 2020).
Local evidence is starting to appear. At the Caldera Bay plant in the Atacama Region, run by Nueva Atacama, a single sampling campaign in October 2024 measured 57.75 PSU salinity at the outfall against 34.87 PSU at 1,000 m, and the authors call for Chilean thresholds and long-term monitoring (Bonnail et al., 2025). One campaign at three stations is not a trend, but it is the kind of data regulators will lean on when the strategy names bays to avoid.
Our reading for a desalination developer is to do three things now: choose the outfall site with the strategy’s bay criteria in mind, collect your own baseline before construction, and keep an option open to concentrate or recover part of the brine if your bay is later flagged. Our page on brine disposal options compares the alternatives to sea discharge, and desalination environmental impact covers outfall and diffuser design.
Rules in motion: what to track in 2026 and 2027
| Instrument | Latest status we could confirm | Why it matters for brine |
|---|---|---|
| DS 90/2000, discharges to sea and surface water | In force | Sets the chloride and sulfate limits above; no salinity parameter |
| Decree replacing DS 90 | Final text approved by the Council of Ministers for Sustainability in January 2026 (La Discusión via CPI, August 2026); withdrawn from the Comptroller’s review on 12 March 2026 with 42 other decrees and not among those resubmitted by June (Chile Sustentable, June 2026). By October 2026 only 9 of the 43 had been resubmitted, with no timetable for the rest (El Desconcierto, 25 October 2026). No resubmission or Diario Oficial publication found as of 4 November 2026; DS 90/2000 stays in force | Draft keeps the river chloride and sulfate limits, adds a 400 mg/L chloride limit for lakes and a ban on dilution, and gives existing sources 42 to 60 months to comply once published |
| Ley 21.813, seawater desalination | Published 12 May 2026; in force 12 November 2027, except the strategy chapter | Concessions, discharge points, bays to avoid, SEIA entry |
| Boletín 17.329, reuse of treated wastewater from submarine outfalls | Passed by the Chamber of Deputies in January 2026 (MCH, 13 January 2026); before the Senate Water Resources Committee in June 2026 (G5 Noticias, 3 June 2026); no enactment found as of 4 November 2026 | Would allow industrial and irrigation reuse; quality rules by regulation within a year of the law |
| Ley 21.075 on greywater, amended by Ley 21.623 | Amendment published 27 November 2023 (Voto Visible) | Household greywater, mainly for agriculture; not an industrial reuse route |
| SEIA reform, Boletín 16.552-12 | Approved by the Senate on 14 April 2026 and sent to the Chamber (Chile Sustentable) | Would change how and where projects are approved |
| Ley 21.770, non-environmental permits | Published September 2025 (Gibson Dunn) | Streamlines sectoral permits; environmental review stays separate |
If your plant will run past 2027, check your design against both the current DS 90 and the withdrawn draft, since the draft may return in some form.
Industrial water reuse in Chile, and the brine it creates
Chile is still legislating a dedicated route for industrial reuse of treated municipal wastewater. Boletín 17.329 would regulate the reuse of treated wastewater now discharged through submarine outfalls, for industrial and irrigation use, with minimum quality requirements set by regulation within a year of the law. Green hydrogen developers face the same question from the supply side: a 2023 study published by the PtX Hub with Chile’s Ministry of Energy reviewed seawater desalination and wastewater reuse as water sources for hydrogen in Antofagasta and Magallanes, and proposed measures to close regulatory gaps (PtX Hub, November 2023).
Every reuse scheme that uses reverse osmosis produces a concentrate. On the coast that may be a permitting detail. Inland it is the DS 90 problem above, and it should be designed together with the reuse plant, not after it. Our guides to industrial water reuse systems and reverse osmosis reject water cover the design side.
When does brine valorization beat discharge in Chile?
Brine valorization means recovering water, salts or minerals from brine that would otherwise be discharged. In Chile the comparison point is what discharge costs you today, and that differs sharply by location:
Coastal site with a permitted outfall. Discharge is cheap, so recovered products must pay their own way. Start with products that replace something you already buy, such as process salt or treatment chemicals, before looking at selling minerals.
Inland site under DS 90 Table 1. The value lies in the ZLD or trucking cost you avoid. Recovering clean water and a saleable or reusable salt can cut the size and energy of the final crystallizer. Our ZLD cost guide sets out what drives that avoided cost.
Desalination plant in a bay that may be flagged. Partial recovery is a hedge against tighter discharge conditions later.
Chilean research is active but early. A University of Atacama team tested an evaporation and crystallization process on seawater and three brines, and estimated revenue of roughly €1 million to €11 million a year from seven recovered elements at 1,000 m³/day (Bonnail et al., Applied Sciences, December 2023). That is the authors’ estimate from test work, not a plant result. The German-Chilean BrineMine project (2019 to 2023), with Fraunhofer ISE, Fraunhofer Chile and the Andean Geothermal Centre of Excellence (CEGA), worked on recovering minerals and fresh water from geothermal brines (Fraunhofer ISE).
Before spending on pilots, answer four questions: how much brine, and how stable is its composition; which product, to what purity, for which named buyer; how the product reaches that buyer; and where the residue goes. Our ZLD guide chapter on the valorization hierarchy sets out the order in which to test products, and mineral recovery from desalination brine covers seawater brine specifically.
Mining and lithium have their own pages
Mine water and acid drainage are covered on Chile mine water treatment, and seawater supply to mines on desalination for mining in Chile. Salar de Atacama brine is covered on Chile lithium brine.
How we work as an independent ZLD consultant for Chilean sites
We start from your water and your permit, not from a technology:
Review the site water balance, lab analyses and the discharge conditions in your RCA. Check each analysis first with our Water Analysis Validator.
Screen the discharge routes against DS 90, DS 609 and, for desalination, Ley 21.813.
Compare discharge, MLD, ZLD and partial recovery on cost, energy and residue.
Write a design basis that suppliers can price on equal terms, and review their offers against it.
See our water treatment and ZLD consulting, water reuse and ZLD systems and brine resource recovery services.
Questions about brine and ZLD in Chile
Is zero liquid discharge mandatory in Chile? The national rules covered on this page do not require ZLD as such. It becomes the practical answer when no permitted discharge route can take the brine, which is common for inland sites discharging to rivers without dilution capacity.
Can we discharge RO concentrate to the sewer? Only with the utility’s acceptance and within DS 609, which limits sulfate to 1,000 mg/L (1,500 mg/L if pH and temperature conditions are met) but sets no chloride or TDS limit. The utility may impose its own conditions.
Check your own discharge route with us
Have your current discharge route, the chloride and sulfate in your feed and the recovery you are aiming for to hand. A scoping call can then show whether discharge survives your project, or whether the real choice is between MLD, ZLD and recovery. You can also send us your project details first.
Written by the Brine Consulting advisory team. The Brine Consulting advisory practice includes Prof. Basel Abusharkh, a senior expert in brine valorization, ZLD, high-recovery desalination and industrial water innovation with deep experience in membrane technologies, brine mining and technology commercialization, and Ghazi Ozair, Senior Consultant, Desalination, Water Treatment & Marine Ecosystems, with more than 45 years of global experience across membrane and thermal desalination, wastewater treatment, produced water, marine protection and water quality management. Meet our experts.