Failure often begins in framing, not equipment. Controlled principle Most MLD/ZLD failures are not isolated
Large plants must be maintainable and predictable. Controlled principle Operability is not a commissioning afterthought.
A claim is only comparable when basis and boundary match. Controlled principle Procurement does not
Pilot the integrated process, not isolated hero equipment. Controlled principle A test is valuable only
Decision maturity must match evidence maturity. Controlled principle A project stage is a permission boundary,