Desalination brine management in North Africa: Egypt, Morocco, Algeria and Tunisia compared

Home Desalination brine management in North Africa: Egypt, Morocco, Algeria and Tunisia compared

Desalination brine management in North Africa is held back less by technology than by missing numbers. In Egypt and Morocco we found no regulation written specifically for desalination brine, and Morocco’s decree on numeric limits for discharges to the sea was still unpublished in November 2026. In Algeria the general limits for industrial effluent contain no salinity parameter at all. Meanwhile all four countries are adding large seawater reverse osmosis (SWRO) plants, and every one of them returns brine to the sea.

This page compares Egypt, Morocco, Algeria and Tunisia, helps you decide where to start, and covers Algeria and Tunisia in their own sections because we have no separate pages for them yet. Brine Consulting is an independent industrial water advisory firm in Amsterdam that sells no treatment equipment. We work with plant owners, developers, lenders and industrial sites in the region remotely or through a defined engagement, most usefully before a discharge route or an outfall is chosen.

Four countries side by side

Country Main water problem Discharge rules, with dates Desalination scale What to check first
Egypt Salt in industrial effluent going to the Nile or drains; on the Red Sea, brine injected into shallow wells close to plant intakes Nile 1,200 mg/L TDS and drains 2,000 mg/L TDS under Law 48 of 1982 and Decree 92 of 2013, amended by Decree 208 of 2018, as tabulated in a 2019 assessment published by the European Investment Bank. Sea: Law 4 of 1994, whose Annex 1 on liquid discharges was replaced by Decree 2466 of 7 August 2024; check the current annex 129 plants with 1.41 million m³ a day in April 2026, 19 more under construction (Egyptian Gazette) The discharge route and its licence; for a Red Sea plant, whether the injection wells and the intake share an aquifer
Morocco An inland conductivity limit on salt, which biological treatment does not remove, and a fast-growing seawater desalination programme Rivers, wadis and aquifers: general limit of 2,700 µS/cm since 1 January 2018 (joint order 2942-13 of 7 October 2013, under Law 36-15 of 2016). Sea: Law 81-12 on the coastline (2015); the decree setting numeric limits was still a draft in February 2026 and unpublished on 4 November 2026 17 seawater plants with about 320 million m³ a year in July 2025; target 1.7 billion m³ a year by 2030 Which route the effluent takes; at the coast, the conditions negotiated in an authorisation that lasts at most five years
Algeria Large Mediterranean SWRO plants discharging brine with no brine-specific rule Law 03-10 of 19 July 2003: impact study for projects (Article 15); dumping at sea banned unless the environment minister authorises it (Articles 52 and 53). Executive Decree 06-141 of 19 April 2006: limit values for industrial liquid effluent, with no TDS, chloride, sulphate or conductivity limit 3.7 million m³ a day after five megaprojects were completed in 2025, about 42% of national drinking water needs (ADC) Outfall dilution, and the conditions written into the plant’s environmental authorisation
Tunisia A growing seawater RO programme (Djerba, Zarat, Sfax, Sousse) whose brine goes to sea Brine from Djerba compared with the Tunisian standard for discharge to the public maritime domain on temperature (35 °C), pH (6.5 to 8.5) and suspended solids (30 mg/l), with no salinity limit in the comparison (Ajala et al., 2022) Djerba 50,000 m³ a day since 2018; Sfax (about 100,000 m³ a day) and Zarat inaugurated in 2024; Sousse (50,000 m³ a day) expected in 2025 (Rosa Luxemburg Stiftung, December 2024) Which parameters and mixing zone the authorisation actually sets, in writing

Two patterns stand out. Inland, salt is what binds: Egypt’s TDS figures and Morocco’s conductivity limit both sit below what an RO reject or a dyehouse effluent typically carries. At the coast, the opposite holds: there is little or no numeric brine limit to design to, so the outfall conditions are negotiated plant by plant.

How to choose where to start

  1. Is the effluent going inland or to the sea? Inland sites in Egypt and Morocco have a salt limit to meet, and dilution does not remove salt. That is where reuse, minimal liquid discharge (MLD) or zero liquid discharge (ZLD) come into play. Start with the Egypt or Morocco page.

  2. Is it a desalination plant? Go to the brine page for the country: Egypt, Morocco, or the Algeria and Tunisia sections below. Where no numeric limit exists, fix your own design basis: where compliance is measured, how large the mixing zone may be, and what salinity excess you accept at its edge.

  3. Does the plant inject brine into wells? Check whether the receiving aquifer also feeds the plant before drilling another well. The Egypt brine page shows why.

  4. Is it a phosphate or fertilizer site? Fluoride, phosphate, acidity and phosphogypsum need their own treatment logic, set out on our phosphate and fertilizer wastewater page.

  5. Is someone proposing to recover minerals from the brine? Screen the products and the market before the pilot, using our guide to mineral recovery from desalination brine.

Our North Africa pages

Egypt

  • Industrial wastewater treatment in Egypt: Egypt’s discharge rules by route (sewer, Nile, drain, sea and the Suez Canal Economic Zone) with current editions, and when textile and Sokhna sites need reuse or ZLD.

  • Desalination brine disposal in Egypt: what Red Sea plants do with their brine, field data on shallow injection wells and on an outfall near reef and seagrass, and which permits apply to each route.

Morocco

  • Industrial wastewater treatment in Morocco: Law 36-15, the 2,700 µS/cm limit, basin agency and sewer permits, the pending coastal decree, and when reuse or ZLD pays.

  • Phosphate and fertilizer wastewater treatment: what OCP’s planned move of phosphogypsum from sea outfalls to land storage at Jorf Lasfar means for the water that used to go to sea with it.

  • Desalination brine in Morocco: how much brine the national programme returns to the sea, plant by plant, the laws that apply while the limits decree is pending, and when valorization is worth a study.

Desalination brine in Algeria: scale, rules and where zero liquid discharge fits

The programme. Algeria’s seawater desalination programme is run by the Algerian Desalination Company (ADC), which was the Algerian Energy Company (AEC) until October 2025 and is a Sonatrach subsidiary. ADC says capacity rose from about 2.2 to 3.7 million m³ a day after five megaprojects were completed in 2025, which it puts at about 42% of the country’s drinking water needs (ADC). Its project pages list Cap Blanc in Oran, Fouka II in Tipaza, Cap Djinet II in Boumerdès and Tighremt in Béjaïa at 300,000 m³ a day each. ADC posted news of the President commissioning the Cap Djinet II plant on 12 March 2025.

The brine. ADC publishes no brine flows. At an assumed recovery of 40% to 45%, the assumption we use on our UAE desalination brine page, each 300,000 m³ a day plant returns roughly 370,000 to 450,000 m³ of brine a day to the Mediterranean. That is a planning estimate, not measured data.

The rules. An article published by the Rosa Luxemburg Stiftung’s North Africa office in December 2024 describes brine discharge in Algeria as taking place “in the absence of specific regulations governing brine discharge” (Belmahi, 2024). The texts we could open bear that out:

  • Law 03-10 of 19 July 2003 on environmental protection requires an impact study or impact notice before projects that affect the environment (Article 15), and bans dumping at sea of substances likely to harm public health or marine ecosystems unless the environment minister authorises it after a public inquiry (Articles 52 and 53).

  • Executive Decree 06-141 of 19 April 2006 sets limit values for industrial liquid effluent, covering temperature, pH, suspended solids, COD, BOD, nutrients, metals, oils and some organics. It sets no limit for TDS, chloride, sulphate or conductivity.

Dilution is the open question. A study published in Environmental Engineering Research in 2026 modelled the brine discharge of the Fouka plant (120,000 m³ a day) and found that the plume from the existing single-port diffuser reached the seabed about 27.5 m from the outlet, at a simulated 44.63 g/L and about 75% dilution. A Venturi diffuser raised dilution before seabed contact to about 93% in the same model (Maamar et al.). These are simulations without field validation, but they show why outfall design deserves as much attention as the RO train.

Zero liquid discharge in Algeria. We found no Algerian rule that requires ZLD, and with no salinity parameter in Decree 06-141, the case for ZLD at an Algerian industrial site does not come from a national salt limit. It comes from the site: no usable receiving water, expensive or scarce supply, or a customer or lender requirement. Confirm with the authority that issues your environmental authorisation which conditions it will write, then compare MLD and ZLD on cost before choosing.

Brine management in Tunisia: SONEDE’s seawater plants and the discharge standard

The plants. SONEDE, the national water utility, runs Tunisia’s seawater desalination programme. The Djerba plant opened in May 2018 and produces 50,000 m³ a day. According to an article published by the Rosa Luxemburg Stiftung’s North Africa office in December 2024, plants at Sfax (about 100,000 m³ a day) and Zarat were inaugurated in 2024, and a 50,000 m³ a day plant at Sousse was expected to start in spring 2025 (Chibani, 2024). We found no later confirmation of the Sousse start-up. WABAG, which built the Zarat plant for SONEDE and so is a supplier source, describes it as designed for 50,000 m³ a day, expandable to 100,000, with brine discharged through a seawater outfall with diffusers (WABAG).

What Djerba shows. A 2022 study of the Djerba plant in the Journal of New Sciences reports brine at about 73 g/l, discharged through a 4,900 m pipe of which 2,600 m runs out to sea. The authors compared brine measurements taken two years after start-up with the Tunisian standard for discharge to the public maritime domain on temperature, pH and suspended solids, and found it compliant (Ajala et al., 2022). Salinity was not one of the parameters compared.

What to do with that. For a Tunisian plant or a coastal industrial site, ask the permitting authority in writing which parameters, measurement point and mixing zone apply, and keep baseline seabed and water data from before start-up. If salinity is not limited today, the data will still decide the argument when it is.

ZLD and brine valorization across the region

Is zero liquid discharge required in Algeria, Egypt or Morocco? We found no law or decree that makes ZLD mandatory for industry in general in any of the three. It becomes the answer when the discharge route leaves no other option at a bearable cost.

Can brine from these plants be valorized? Technically, yes. Commercially, it depends on the product, the purity buyers need and who holds the brine. Our Morocco brine page and our guide to mineral recovery from desalination brine show how to screen it.

Projects that do not fit one country page

Some projects straddle these pages: an industrial site with its own desalination unit, a plant that both injects and discharges to sea, or a lender comparing plants in two countries. For those, tell us which route the brine takes today and which country’s rules apply. Book a scoping call, send us your project details or email christos@brineconsulting.com. See also our brine resource recovery service, our ZLD vendor proposal checklist for comparing offers, and our comparison of brine discharge regulations by region.

Written by the Brine Consulting advisory team. The Brine Consulting advisory practice includes Ghazi Ozair, Senior Consultant, Desalination, Water Treatment & Marine Ecosystems, a senior desalination and environmental water expert with more than 45 years of global experience across membrane and thermal desalination, wastewater treatment, produced water, marine protection, and water quality management, and Paolo Mattiuzza, Executive Advisor, Brine Management & ZLD Systems, a senior brine management and ZLD specialist with more than 20 years of international experience in environmental technologies, industrial water treatment, and resource recovery. Meet our experts.