Industrial wastewater treatment in Morocco: the 2,700 µS/cm limit, permits, reuse and ZLD

Home Industrial wastewater treatment in Morocco: the 2,700 µS/cm limit, permits, reuse and ZLD

For industrial wastewater treatment in Morocco, one limit deserves attention before COD or metals: conductivity. Since 1 January 2018, any discharge to a river, wadi or aquifer that is not covered by a sector-specific limit has had to meet a general limit of 2,700 µS/cm, and biological treatment does nothing to bring salinity down. Where the effluent goes, a river, a sewer or the sea, decides which authority signs off and which limits apply.

This page sets out the Moroccan rules for each route, with the current texts and their dates as we found them in November 2026, and shows when reuse, minimal liquid discharge (MLD) or zero liquid discharge (ZLD) makes sense. Brine Consulting is an independent industrial water advisory firm based in Amsterdam. It sells no treatment equipment, and it advises Moroccan sites remotely or through a defined engagement.

Law 36-15, the coastal law and the older decrees still in force

Law 36-15 on water, promulgated on 10 August 2016 (Dahir 1-16-113, French edition of the Bulletin Officiel no. 6506, 6 October 2016), is the parent law for discharges to water and for reuse. Several of its implementing texts still date from the previous law, Law 10-95, and remain in force. The coast has its own law. This is a starting point for a permit discussion, not legal advice; the Bulletin Officiel text governs.

Where the effluent goes Main law Implementing texts in force (latest we found) Who authorises What it means for salt
River, wadi, canal or groundwater Law 36-15, Articles 98 to 102 Decree 2-04-553 of 24 January 2005 on discharges; joint order 2942-13 of 7 October 2013 on general limit values (Bulletin Officiel no. 6202, 7 November 2013; in force 1 January 2018); sector orders where they exist The basin agency (agence du bassin hydraulique, ABH) for the catchment, after a 30-day public inquiry; authorisation for up to 10 years General limit of 2,700 µS/cm conductivity, plus sulphate and other dissolved species
Public sewer Law 36-15, Article 109 Network operator’s own terms; Decree 2-04-553 makes the sanitation operator collect the pollution fee from its industrial users The network operator, for up to 20 years Set by the operator’s acceptance terms; no separate national salinity figure for sewer discharge found
The sea Law 81-12 on the coastline (Dahir 1-15-87, 16 July 2015), Articles 37 to 43 General and specific limit values are to be set by decree. The draft decree was still with the Secretariat General of the Government in February 2026 (Le360, 27 February 2026); we found no published version by 4 November 2026 The competent administration, for up to five years, renewable No numeric marine limit published yet; a discharge register and treatment can be required
Reuse of treated wastewater Law 36-15, Articles 64 to 69 Decree 2-97-875 of 4 February 1998 on the use of wastewater, adopted under Law 10-95 and still listed as in force by the Souss-Massa basin agency The ABH, for up to 20 years; recycling inside the plant is exempt from reuse authorisation (Article 66) Quality must suit the use; reuse is exempt from the water-use fee (Article 27)

Three details in these texts change real projects.

  • The general limits are old and due for review. Decree 2-04-553 (Article 13) requires limit values to be reviewed every ten years. The general values were fixed in October 2013. We found no revised set as of November 2026, so the 2013 order still applies.

  • Compliance is judged on averages, with a tolerance. Under joint order 2942-13, a discharge complies if at least 95% of the parameter averages meet the limits and the rest exceed them by no more than 25% (pH and temperature excluded). Compliance is checked on at least four composite samples a year, each made of at least six portions over a normal working day. A site that runs at 3,000 µS/cm all year sits inside the 25% band only if nearly every other parameter is clean; one that runs at 4,000 µS/cm does not.

  • The coast is not a free route. Law 81-12 prohibits any discharge that pollutes the coastline, caps each authorisation at five years and sets fines of 20,000 to 500,000 dirhams, and prison terms, for breaches (Article 50). Until the limits decree is published, the authorisation conditions are negotiated case by case.

The basin agency is where most permits are won or lost

For a direct discharge, the ABH sets the volume, the maximum flow, the discharge point, the sampling programme and the pollution fee in the authorisation (Law 36-15, Article 101). If a site breaches its conditions, the agency issues a 30-day formal notice, then can suspend the authorisation and close the installation, and finally revoke it (Article 102).

The pollution fee is calculated from pollution units, using characteristic quantities and pollution coefficients for industrial activities set by joint order 2944-13 of 7 October 2013, and reduced for treatment efficiency (Decree 2-04-553, Articles 16, 18 and 20). Measured values replace the estimate from the next billing cycle (Article 19), so a site whose measured load is below the coefficient estimate can pay less. Ask the ABH for the current rate before you build a business case on it.

Sector-specific limit orders exist for some industries, for example pulp and paper, sugar and domestic wastewater (2006) and hot-dip galvanising (2010). Where a sector order applies, it replaces the general values for that activity, so check the list with the ABH at the start.

Sewer connections: the operator’s terms decide

An industrial discharge to a public sewer needs prior authorisation from the network operator (Law 36-15, Article 109). Who that operator is depends on the city: ONEE, the national water and electricity office, a municipal régie, a delegated operator, or one of the regional multiservice companies (SRMs) created under Law 83-21, the first of which were set up in 2024 (Challenge, 31 July 2024). We found no national salinity limit for discharges to sewer. In practice the operator will want to know what its treatment plant can take, and a high-salinity stream can disturb that plant and spoil its effluent for reuse. Get the acceptance terms in writing before you size pretreatment.

In an industrial zone, the zone’s own treatment plant often plays that role. At Tanger Automotive City, for example, the zone plant (53,400 population equivalent, activated sludge with tertiary treatment) supplies water for green spaces, and surplus treated water flows to the Jnan Mokhtar wadi (Tanger Med, 3 October 2022). A plant like that is designed for biodegradable load, not salt, so a saline or toxic tenant stream needs the operator’s agreement before it is connected.

Reuse: where Morocco is pushing industry

Reuse is policy, not just good practice. The Interior Minister reported that about 37 million m³ of treated wastewater was reused in 2023, against a target of 100 million m³ by 2027, and five industrial reuse projects with OCP and a mining company in Béni Mellal, Fquih Ben Salah, Safi, Agadir and Marrakech (Le Matin, 1 October 2024). OCP reports that its Gantour site has taken treated wastewater from the Marrakech treatment plant since 15 June 2025 (OCP Green Water, via IDRA, 14 July 2025).

For a factory, two legal routes matter. Recycling water inside the plant needs no reuse authorisation (Article 66), which makes on-site reuse of RO permeate simple to permit. Taking treated municipal effluent from outside needs an ABH authorisation of up to 20 years, which can be combined with the withdrawal authorisation (Articles 67 and 69). Our guide to industrial water reuse systems covers the technology side.

How much salt has to come out to meet 2,700 µS/cm? (hypothetical example)

Conductivity is a limit on salt, so it helps to translate it. Using a typical conversion factor of 0.65, 2,700 µS/cm corresponds to about 1,755 mg/L of total dissolved solids (TDS). The real factor for your effluent can sit anywhere from about 0.55 to 0.75, which moves the equivalent between roughly 1,485 and 2,025 mg/L, so measure both on the same samples. Our water analysis validator checks that an analysis is internally consistent before you rely on it.

Assume an inland site discharges 1,000 m³/day to a wadi after biological treatment, at 2,600 mg/L TDS (about 4,000 µS/cm at the same factor). That is 2.6 tonnes of salt a day, and at most about 1.76 tonnes a day can leave in a compliant discharge of 1,000 m³. Two ways to close the gap, with RO at 75% recovery and permeate at 2% of the feed concentration:

Option A: treat a side stream Option B: treat everything and reuse
Flow sent to RO about 400 m³/day 1,000 m³/day
Permeate about 300 m³/day, blended back into the discharge 750 m³/day, reused in the plant
Discharge to the wadi about 900 m³/day at about 1,755 mg/L, right at the limit with no margin, so a real design would treat more none
RO reject to deal with about 100 m³/day at about 10,200 mg/L (about 1.0 t salt/day) 250 m³/day at about 10,200 mg/L (about 2.6 t salt/day)
Permit questions ABH must accept the blended discharge; the reject still needs an outlet Internal recycling needs no reuse authorisation; the reject needs an outlet

Neither option removes the salt from the site: the RO reject still has to go somewhere. Inland, that usually means evaporation. Concentrating Option B’s reject to 200,000 mg/L leaves about 13 m³/day of concentrate after evaporating about 237 m³/day, and then a crystallizer turns it into roughly 2.6 tonnes a day of mixed salts that need a disposal route of their own (see mixed salt disposal in ZLD).

Option A is cheaper to build and keeps a permitted discharge. Option B costs more but returns 750 m³/day of water, which matters where withdrawals are restricted. Confirm early that the ABH will treat a blended discharge as compliant; we found no explicit Moroccan rule on blending, so get the position in writing. Run your own figures with our brine mass balance calculator and MLD vs ZLD screener. The figures above are illustrative, not a design.

When the RO reject has nowhere to go: the case for ZLD

We found no Moroccan law or decree, as of November 2026, that makes ZLD mandatory for industry in general. ZLD becomes the answer when the disposal endpoint leaves no other option. It tends to be justified when:

  • the site is inland, the conductivity limit binds and the sewer operator will not take the reject;

  • withdrawals are restricted or water is expensive, so recovered water has real value;

  • a customer or lender requires it.

MLD is usually the better first look when a coastal outfall can be authorised under Law 81-12, when the sewer operator can accept a concentrated stream on agreed terms, or when the salts would end up in costly hazardous waste disposal. Once ZLD is on the table, in our view the evaporation duty and the salt disposal price decide most of the cost; our guide to ZLD cost sets out the drivers.

Phosphate sites and desalination plants

Morocco’s phosphate and fertilizer complexes, run by OCP at Khouribga, Benguerir, Youssoufia, Jorf Lasfar and Safi, are a case of their own. Their effluents carry fluoride, phosphate, sulphate and cadmium, and the phosphoric acid plants produce phosphogypsum in very large volumes. Those streams need their own treatment logic, which we cover on our page on phosphate and fertilizer wastewater treatment.

The other fast-growing source of salt is seawater desalination. In July 2025 the ministry counted 17 plants in operation, with a target of 1.7 billion m³ a year by 2030 (Hespress, 15 August 2025), and every one returns brine to the sea under the coastal law described above. Where that brine goes and what the rules say is covered on desalination brine in Morocco.

What we check first on a Moroccan site

Our work for Moroccan sites is done remotely or through a defined engagement, from the data the site shares, and since Brine Consulting sells no treatment equipment it ends in a recommendation, not an equipment offer. Three questions come first: does the discharge meet 2,700 µS/cm under the 95% rule, what will the ABH or network operator accept in writing, and where would an RO reject go. In practice:

  • reading the authorisation against the averaging rule in joint order 2942-13 and the last year of composite samples;

  • using a whole-site water balance to test reuse, including whether treated municipal effluent could replace part of the withdrawal;

  • MLD and ZLD feasibility once the reject’s outlet is known;

  • checking supplier offers against each other, and against our ZLD vendor proposal checklist.

The data that settles most of these questions: conductivity and TDS measured on the same samples, two or three full ion analyses, a year of flows, the current ABH or operator authorisation and any formal notice. More on our water treatment and ZLD consulting and water reuse and ZLD systems services, and on our North Africa page, which also links our Egypt page.

Before the ABH dossier or the equipment order goes in

A blended discharge, full internal reuse and ZLD lead to very different capital and permit paths, and the basin agency’s view on blending is worth having in writing before anything is ordered. Book a scoping call or send us your project details with the current authorisation.

Written by the Brine Consulting advisory team. The Brine Consulting advisory practice includes Osis G. Kalache, P.Eng., Senior Consultant, Wastewater Process Engineering & Optimization, a senior wastewater process engineering and optimization expert with more than 17 years of experience in industrial and conventional wastewater treatment, and Dimitra Aravani, External Advisor, Industrial Wastewater & Water Reuse, a senior consultant specializing in industrial wastewater treatment, water reuse, resource recovery, and water efficiency strategies, with more than a decade of experience supporting industrial and municipal clients. Meet our experts.

Questions about your site's water or brine?