The short answer. Under the Omgevingswet, who permits your industrial wastewater depends on where it goes. Discharges directly to surface water or to a wastewater treatment plant usually need a permit from the regional water authority (waterschap) or, for state waters, Rijkswaterstaat. Discharges via the sewer or soil usually fall to the municipality or province. Before applying, you must assess your own discharge in six steps, ending with an immission test that checks the effect on the receiving water, including its salinity. When a saline or ZZS-containing stream fails that test, the options narrow quickly, and that is when minimum or zero liquid discharge (MLD or ZLD) comes into view.

Who issues a discharge permit: the competent authority by route

Where your wastewater goesWhat Dutch law calls itUsually permitted by
Directly to regional surface water (canal, river, lake)Lozingsactiviteit (waste water discharging activity)Regional water authority (waterschap)
Directly to state waters (rijkswateren) or the North SeaLozingsactiviteitRijkswaterstaat
Into a wastewater treatment plantLozingsactiviteitThe water authority or the plant’s operator
Via the municipal sewer or into the soilMilieubelastende activiteit (environmentally harmful activity)Municipality or province, often through the omgevingsdienst

To find out whether you need a permit or only a notification, run the permit check (Vergunningcheck) in the national Environment and Planning Portal (Omgevingsloket).

General rules or a discharge permit?

Many discharges are covered by general rules rather than an individual permit. Those rules sit in the Besluit activiteiten leefomgeving (Bal), the municipality’s omgevingsplan, the water board’s waterschapsverordening and, in places such as groundwater protection areas, provincial rules. The Bal states, activity by activity, which discharges need a permit. For state waters, the permit-required cases are listed in article 6.55 of the Bal (and article 7.60 for the North Sea). Water boards can add permit or notification duties for regional waters, for example for large volumes.

One rule surprises many operators: business wastewater from an activity that is not designated in the Bal may only be discharged to the public sewer, under the rules of the omgevingsplan.

The six-step assessment before a discharge permit application

The Dutch system puts the first assessment on the applicant. Before you apply or notify, work through these steps:

  1. Prevent the discharge where you can. Reusing water in the process, if necessary after treating it yourself, always ranks above discharging it.
  2. Check the general rules that apply to your activity and route.
  3. Fix the discharge route (surface water, sewer or soil). The route determines who your competent authority is.
  4. Establish substances and quantities: concentrations and loads for every relevant substance, as a well-supported estimate for a new process.
  5. Apply best available techniques (BBT), using the relevant BREFs and sector studies. If you do not meet BBT, the authority can refuse the application.
  6. Run the ABM test, then the immission test. The ABM classifies how harmful your substances are to water and flags any substances of very high concern (ZZS). The immission test then compares your residual discharge with the space left between the receiving water’s current quality and its standard, assessed at the edge of a mixing zone.

If the immission test shows unacceptable effects, you need further measures beyond BBT (sometimes called BBT+), judged on their cost-effectiveness. You then recalculate and repeat the test.

For ZZS, the starting point is zero discharge. A residual discharge can be accepted when it is unavoidable and passes the immission test, and permits require you to reassess it every five years. Our page on ZZS discharge requirements goes into more detail.

What the application contains

For each wastewater stream, the application states its composition, the quantities you will discharge and how the wastewater arises, together with the results of your BBT, ABM and immission tests. The composition you state becomes the basis for the discharge limits and monitoring in your permit, so it pays to get the data right.

Timelines and appeal

The competent authority decides within 8 weeks, extendable once by 6 weeks. Where an activity has a substantial environmental impact, the extended procedure applies and can take up to 26 weeks. If you disagree with the decision, you can appeal to the court within 6 weeks of publication; under the extended procedure, you must first submit a zienswijze.

When permits push a site toward MLD or ZLD

The immission test also covers salinity and nutrients. For sites with brine, RO concentrate, regeneration waste or cooling tower blowdown, that is often where the trouble starts, especially on small or slow-flowing receiving waters.

The key point is that salt is conserved. Concentrating a saline stream reduces its volume, but not the amount of salt it carries to the river. Here is a simplified illustration with hypothetical figures, using full mixing only. The real Handboek Immissietoets method is more detailed.

A site discharges 50 m³ per hour of concentrate containing 20,000 mg/l chloride into a stream carrying 1,800 m³ per hour at 100 mg/l.

  • Chloride load: 50 m³/h × 20 kg/m³ = 1,000 kg per hour
  • Concentration after full mixing: (1,000,000 + 1,800 × 100) / 1,850 = about 640 mg/l, more than six times the background

Now suppose the site evaporates the concentrate to half its volume. The stream is smaller and saltier, but the load is still 1,000 kg of chloride per hour, so the receiving water ends up in the same place. When the immission test fails on salt, only a few things change the outcome:

  • Make less salt in the first place: source reduction, different regenerants, segregating saline streams
  • Choose another route: a larger receiving water, the sea, or a treatment plant that can accept the stream
  • Remove the salt from the water: crystallizing it into solids that leave the site, which is what ZLD does, as explained in our guide to the brine treatment process

MLD fits where the water authority can accept a smaller residual liquid stream, for instance when the problem is volume or water use rather than the salt load itself. Our MLD vs ZLD Decision Screener helps test which direction deserves evaluation, and our ZLD feasibility study guide explains what a study should cover.

How Brine Consulting can help

We help sites prepare the technical basis of a discharge application or permit change: closing the water and salt balances, characterizing the stream, screening BBT options, and showing what source reduction, MLD or ZLD would mean for the immission result and for cost. We sell no treatment equipment, so the options we put in front of you are not tied to a supplier. See our brine management and recovery service.

Request a consultation about your discharge, or estimate your current levy with our Dutch wastewater levy calculator.

Frequently asked questions

Do I need a permit or just a notification?

It depends on your activity, your discharge route and local rules. The Vergunningcheck in the Omgevingsloket tells you which applies and lets you submit online.

Who is the competent authority for discharges to the sewer?

Usually the municipality or province, often working through the regional omgevingsdienst. Direct discharges to surface water usually fall to the water board, or Rijkswaterstaat for state waters.

Does the immission test apply to salt?

Yes. Since 1 July 2020, the Handboek Immissietoets makes clear that applicants also test nutrients and salinity.

What happens if our stream contains ZZS?

Zero discharge is the starting point. An unavoidable residual discharge can be permitted if it passes the immission test, and you must reassess it every five years.

Will evaporating our concentrate help us pass the immission test?

Not on salt alone. Evaporation reduces volume, but the salt load to the receiving water stays the same unless the salt is removed as solids or not produced in the first place.

Sources

Written by the Brine Consulting advisory team. The Brine Consulting advisory practice includes Osis G. Kalache, P.Eng., a senior wastewater process engineer with more than 17 years in industrial wastewater treatment and process optimization, and Cesar J.M. Chu Ortega, a water-tech strategist with expertise in water reuse, zero liquid discharge and industrial wastewater treatment. Meet our experts.