Industrial water reuse in Brazil sits between two sets of rules that do not yet meet. National reuse criteria were approved by the water and environment councils on 1 September 2026 but had not been published with a number when we checked on 4 November 2026, while the discharge standard that decides where your brine or RO concentrate can go, CONAMA Resolution 430/2011, sets no limit on salt at all. The constraints on salt come instead from the class of the receiving river and from state sewer rules, and those are what usually decide whether a reuse project can stop at reverse osmosis or has to go on to minimal or zero liquid discharge.
Brine Consulting, an independent industrial water advisory firm in Amsterdam, sells no treatment equipment: when your outlet cannot take the reject from an 80% recovery RO, we have no membrane system or evaporator of our own to propose instead. We advise Brazilian plants from their data and documents, remotely or through a defined engagement, and are most useful before the reuse target, the concentrate route and the supplier offers are fixed.
The rules that shape a reuse project in Brazil
| Level | Instrument and date | What it means for reuse or ZLD |
|---|---|---|
| Federal: discharge | CONAMA Resolution 430 of 13 May 2011 (DOU 16 May 2011) | Sets pH, temperature, oils, settleable solids and BOD removal for direct discharge, and no limit for chloride, sulfate or total dissolved solids. A revision is in progress: public consultation closed on 6 October 2025 (FIESC), and a May 2026 article reported the draft had cleared the technical chamber on environmental quality, with legal review and a plenary vote still to come (Outras Palavras). We found no amended text published by 4 November 2026. |
| Federal: receiving water | CONAMA Resolution 357 of 17 March 2005, as amended | Sorts rivers into classes. Your effluent may not push the river outside its class targets beyond the mixing zone (CONAMA 430, articles 5 and 13), and the freshwater classes do carry limits for chloride, sulfate and dissolved solids. |
| Federal: reuse | CNRH Resolution 54 of 2005, and a joint CNRH and CONAMA resolution approved on 1 September 2026 (Agência iNFRA) | The new resolution sets national criteria and minimum quality parameters for direct non-potable reuse, including industrial uses, with technical annexes to follow in the Diário Oficial. Until it is published, CNRH 54/2005 remains the general federal reference. |
| Federal: sanitation | Law 14,026 of 15 July 2020 | Sanitation service contracts must include targets that cover reuse of treated sewage (article 10-A of Law 11,445/2007 as amended, cited in ANA’s consultation on a reuse reference standard), which gives utilities a reason to look for industrial reuse customers. |
| São Paulo | State Decree 8,468 of 8 September 1976: article 18 (rivers) and article 19-A (public sewers, added by Decree 15,425 of 23 July 1980) | Article 18 has no salt limit. Article 19-A caps sulfate at 1,000 mg/L and fluoride at 10 mg/L for discharges into the public sewer. |
| Rio de Janeiro | NT-202.R-10 (CECA Deliberation 1007, 4 December 1986); State Law 7,599 of 24 May 2017 | NT-202 sets no chloride, sulfate or TDS limit. Law 7,599 requires industries with 100 or more employees to install water treatment and reuse equipment, with exclusion from state incentives and contracts as the sanction. It sets no reuse percentage. INEA has also circulated a draft industrial reuse norm that leaves reuse water quality to the needs of the receiving process. |
| Minas Gerais | Joint Normative Deliberation COPAM/CERH-MG 8 of 21 November 2022, which revoked DN 01/2008 | Its discharge table limits boron (5.0 mg/L), fluoride (10.0 mg/L) and sulfide (1.0 mg/L) but not chloride, sulfate or TDS. Its class 1 river targets include 250 mg/L chloride, 250 mg/L sulfate and 500 mg/L dissolved solids. |
If you are working from a summary that still cites DN 01/2008 for Minas Gerais, it is out of date. For how these rules compare with other countries, see our brine discharge regulations guide.
Is there a national quality standard for industrial reuse water?
Not one with numbers you can design to yet. The joint CNRH and CONAMA resolution approved on 1 September 2026 sets national criteria, and its annexes were due to be published in the Diário Oficial; we had not found them published by 4 November 2026. In the draft put to public consultation in October 2022, the industrial category had no numeric limits and left quality to the needs of each process, apart from a recommended ammonia ceiling of 1.0 mg/L where copper alloys are present (consultation page). Check the published text before you rely on it.
Does Brazil limit salt in RO concentrate?
Not in the national effluent standard, but salt is still limited in three other places. CONAMA 430 lists no chloride, sulfate or TDS limit, which is often read as “salinity is not regulated in Brazil”. In practice the river’s class, the sewer operator’s rules and your licence decide how concentrated your reject can be.
The river’s class. Beyond the mixing zone, the receiving water has to stay within its class. In Minas Gerais the 2022 deliberation sets class 1 targets of 250 mg/L chloride, 250 mg/L sulfate and 500 mg/L dissolved solids, and the federal class 2 values used across Brazil are the same. In our view, a concentrate stream that is small next to a large river is rarely the constraint; the same stream into a small inland river in the dry season can be.
The sewer operator’s rules. Where you send reject to the public sewer, the state or the utility sets the acceptance limits. In São Paulo, article 19-A puts sulfate at 1,000 mg/L and fluoride at 10 mg/L, and lets the sewer operator relax or tighten those limits in specific cases, with notice to CETESB.
The licence. State agencies can add conditions for other substances case by case. Rio’s NT-202 says so explicitly, and so does São Paulo’s decree. Whatever the general standard says, your licence is what you are measured against.
Worked example: how a sewer sulfate limit caps RO recovery (hypothetical)
A plant in São Paulo wants to recover water from its treated effluent with reverse osmosis and send the reject to the public sewer. Assumptions: RO feed of 100 m³/h with 300 mg/L sulfate, near-complete sulfate rejection, no other treatment of the reject. The concentration factor in the reject is roughly 1 ÷ (1 − recovery).
| RO recovery | Concentration factor | Sulfate in reject | Reject flow |
|---|---|---|---|
| 60% | 2.5 | 750 mg/L | 40 m³/h |
| 70% | 3.3 | 1,000 mg/L | 30 m³/h |
| 75% | 4.0 | 1,200 mg/L | 25 m³/h |
| 80% | 5.0 | 1,500 mg/L | 20 m³/h |
With this feed, any recovery above 70% puts the reject over the article 19-A limit. Sulfuric acid dosed for scale control adds more sulfate and lowers the ceiling further. The options are then to accept the lower recovery, remove sulfate before or after the RO, find a different outlet under licence, or treat the reject further, which is where minimum and zero liquid discharge come in. Our brine concentration factor calculator runs the same check for other ions and recoveries.
Run this check before you compare RO offers. A supplier quoting 80% recovery is not wrong about the membranes; the question is whether your outlet can take what is left.
Reuse projects already running in Brazil
Aquapolo, São Paulo. Opened in November 2012, Aquapolo takes treated sewage from Sabesp’s ABC plant, treats it further with disc filters, a membrane bioreactor with ultrafiltration membranes and reverse osmosis, and pipes it 17 km to the Capuava petrochemical complex in Mauá. Capacity is 1,000 L/s, of which Braskem contracted 650 L/s on a 41-year supply, and the investment was R$364 million (Braskem, December 2012). In March 2026 the Diário do Grande ABC reported about 138 billion litres produced over 13 years and Braskem using about 900,000 m³ of reuse water a month, all of its water in the region (DGABC, 21 March 2026). Our arithmetic on those reported figures: an average output of roughly 340 L/s, about a third of nameplate capacity.
Vitória, Espírito Santo. According to a Veolia press release (supplier-written, July 2025), the Águas de Reúso de Vitória station, a partnership between GS Inima and the state utility CESAN, is designed for 450 L/s using a membrane bioreactor, ultrafiltration and high-recovery RO, with ArcelorMittal and Vale as industrial offtakers. The release says the project stems from Brazil’s first public tender for water reuse (Veolia, 29 July 2025).
In our reading, two lessons carry over to a single plant. First, both projects are built around anchor industrial buyers on long contracts, so the offtake terms matter as much as the treatment train. Second, neither public description says where the RO concentrate goes. On any reuse project, ask that question at the start, because it decides which of the rules in the table above apply to you.
Does Brazil’s water charge justify a reuse plant?
Rarely on its own, in our view. Brazil charges for raw water taken from rivers in basins where a committee has approved it, and the unit prices are low next to the running cost of a reuse plant. In the federal rivers of the Piracicaba, Capivari and Jundiaí (PCJ) basins, the 2026 unit prices are R$0.0226 per m³ withdrawn, R$0.0455 per m³ consumed and R$0.2271 per kg of BOD discharged (ANA, PCJ charges page).
A hypothetical site taking 100 L/s all year (3.15 million m³) and consuming 20% of it would pay about R$71,000 for withdrawal and R$29,000 for consumption, roughly R$100,000 a year, before the basin’s coefficients are applied. Set against the energy, chemicals and membrane replacement of a reuse plant treating that flow, a charge of this size does not carry the project. The stronger reasons are more often supply security in a dry year, a withdrawal permit (outorga) that may not be renewed at the same volume, the utility tariff you would otherwise pay, or a licence condition. Price those first.
Is ZLD required in Brazil, or will reuse with a discharge do?
None of the federal or state rules above makes zero liquid discharge a general legal requirement in Brazil. ZLD becomes the practical answer when the outlet runs out: the sewer will not take the reject, the river’s class leaves no room, or the licence rules out a liquid discharge.
Reuse with a liquid outlet fits when the concentrate passes the sewer or river test at the recovery you need. Our guide to industrial water reuse systems covers the treatment trains, and our independent guide to industrial reverse osmosis systems covers how to compare RO suppliers.
Minimal liquid discharge fits when a smaller, more concentrated reject is acceptable but a full crystalliser is not justified.
ZLD fits when no liquid outlet is available at a cost you can accept, or when recovered salts have a buyer. See what ZLD costs and our MLD vs ZLD screener.
Our ZLD guide argues for starting from the end of the pipe: evaluate the disposal endpoint first. In Brazil that means reading the receiving water’s class, the sewer rules and your licence before choosing a technology. If your reject or blowdown comes from cooling towers, our page on cooling tower blowdown ZLD covers that stream in detail.
Offshore oil and gas is a separate regime
Produced water from Brazil’s offshore platforms is regulated under CONAMA Resolution 393/2007 and each unit’s IBAMA licence, not the onshore rules on this page. Our page on produced water treatment in Brazil covers the pre-salt FPSOs, the oil-in-water test and treatment sizing.
What we would check first at a Brazilian plant
Our first pass on a Brazilian reuse or ZLD question comes down to four checks, in this order:
Which rule governs the concentrate. The public sewer under the state decree and the utility’s conditions, a river under its CONAMA 357 class, or a licence condition that overrides both. This sets the target before anyone sizes equipment.
Whether the analyses can carry that test. Sulfate, chloride, fluoride, silica and hardness measured rather than estimated, and checked for consistency with our Water Analysis Validator.
The recovery the outlet allows. The worked example above, repeated for every ion with a limit, at the recoveries the suppliers are quoting. Our industrial water balance tool helps place each stream first.
Offers on one basis. Reuse, MLD and ZLD bids compared at the same feed, recovery and concentrate route, using our ZLD vendor proposal checklist.
The water reuse and ZLD systems and water treatment and ZLD consulting service pages describe the work in more detail, and where we work lists our other regional pages.
Before you sign an RO or ZLD offer in Brazil
If a supplier has quoted a recovery that nobody has yet checked against your sewer or river limit, or a reuse target was set before the concentrate route was known, that is the point to get a second opinion. Book a call to talk it through, or send the analyses and supplier offers through our consultation page.
Written by the Brine Consulting advisory team. The Brine Consulting advisory practice includes Dimitra Aravani, External Advisor, Industrial Wastewater & Water Reuse, a senior industrial wastewater and reuse consultant with more than a decade of experience delivering water efficiency, reuse, and resource recovery projects for industrial and municipal clients, and Osis G. Kalache, P.Eng., Senior Consultant, Wastewater Process Engineering & Optimization, a senior wastewater process engineer with more than 17 years of experience in industrial and conventional wastewater treatment, process optimization, modular system design, and client-facing engineering delivery. Meet our experts.