Mine water treatment in Australia is not one problem. An iron ore mine in the Pilbara usually has too much reasonably good water and nowhere useful to put it. A potash project on a salt lake is pumping brine several times saltier than seawater. A sulphide ore body produces acid and metals that will outlast the mine. Each one needs a different answer, and only some of those answers involve a treatment plant.
This page sets out how to tell which problem you have, what Western Australia’s rules actually control, and where treatment earns its cost. Coal mine water in Queensland has its own regulator and release rules, so it has its own page. Brine Consulting, an independent industrial water advisory firm in Amsterdam that sells no treatment equipment, reviews mine water decisions for Australian sites remotely or through a defined engagement. We work from your water balance, licence and management plan; the local engineers keep the approvals.
Which mine water problem do you have?
| Problem | Where it shows up | What sets the limit | Where treatment fits |
|---|---|---|---|
| Surplus dewatering water | Pits below the water table, typical of large Pilbara iron ore operations | Volume, and finding an approved destination for it | Often minimal: fit-for-purpose use, transfer, reinjection or controlled release; treatment only for a specific end use |
| Hypersaline water and brine | Salt lake projects and saline groundwater in inland WA | The salt load | Desalting to fresh water rarely pays; the brine may be the resource |
| Acid and metalliferous drainage | Sulphide-bearing waste rock, tailings and pit walls, including legacy sites | Acidity and metals first, then the salts left after neutralising | Prevention first; active or passive treatment for what cannot be prevented |
| Coal mine water | Queensland’s Bowen Basin and other coal regions | Salinity, released only when rivers are flowing | See Queensland mine water treatment and coal seam gas brine |
Many sites have more than one. A Pilbara mine can run a clean dewatering surplus and a small acid drainage problem from one waste dump at the same time, and the two should not share a treatment plan.
Western Australia: who controls mine water
Three sets of rules apply, and they are run by the Department of Water and Environmental Regulation (DWER).
Taking the water. Dewatering needs a 5C licence to take water under the Rights in Water and Irrigation Act 1914, and bores need a 26D licence to construct. The licence comes with an operating strategy: a detailed water balance, a dewatering schedule, monitoring, triggers and contingencies. These requirements are set out in the Western Australian water in mining guideline (May 2013, updated November 2024 to align with the Environmental Protection Amendment Act 2024).
Discharging it. Under Part V of the Environmental Protection Act 1986, mine dewatering is a prescribed premises category (category 6) at 50,000 tonnes a year or more, as is processing or beneficiation of ore (category 5). Prescribed premises need a works approval and a licence; our Australia page covers the licensing pathway across the states.
Deciding what the surplus is for. DWER’s policy on the use of mine dewatering surplus (October 2020) sets an order of preference: first mitigate environmental impacts, for example by reinjecting or supporting groundwater-dependent wetlands; then use the water on site for fit-for-purpose activities such as ore processing and dust suppression; then, for whatever is left, transfer it to other users, inject it into an aquifer or release it under control to a designated watercourse or wetland. The policy encourages beneficial use over disposal and requires proponents to test the water for the proposed end use.
The same policy gives the scale: more than 200 licences to take water for dewatering, with total dewatering volumes above 300 GL a year.
What a Pilbara dewatering licence actually limits
It is easy to assume a discharge licence sets hard limits on everything in the water. A real example shows otherwise. The DWER licence for the Woodie Woodie manganese mine near Marble Bar (L6131/1990/13, held by Pilbara Manganese Pty Ltd, in the version amended in June 2016 and published with an EPA referral) lists:
an approved dewatering capacity of 55,188,000 tonnes a year, which is about 55 GL of water;
discharge points to three ephemeral creeks that drain to the Oakover River, about 10 km downstream;
one numerical limit on those surface discharges: total suspended solids of 80 mg/L;
monthly monitoring, but no licence limit, for total dissolved solids, pH, nutrients, sodium, magnesium and metals, with zinc, lead and cadmium adjusted for water hardness;
site-specific trigger levels held in a groundwater and surface water management plan rather than in the licence itself.
Two lessons follow for anyone sizing treatment. First, the binding numbers may sit in a management plan, so a design basis taken from the licence alone can miss them. Second, a hardness-adjusted metals trigger means the same metal concentration can be acceptable in one creek and not in another. DWER’s register shows later amendments to this licence (two notices in 2017 and an amendment granted in September 2024) and an expiry of September 2028, so check the current licence and plan before relying on any figure.
The Pilbara: a volume problem more than a salt problem
Much Pilbara dewatering water is of good enough quality that the debate is about where it goes, not how to clean it. CSIRO’s Pilbara Water Resource Assessment found that about 350 GL a year was extracted from the region’s inland aquifers in 2013, as aquifers were dewatered to reach iron ore deposits and to supply the companies, and that about 200 GL a year was added back to the environment (CSIRO, October 2015). Writing in Mine Australia in August 2024, a water strategy manager at the engineering consultancy GHD cited a higher CSIRO figure of about 550 GL a year, against 310 GL a year used across the Perth metropolitan area, the south west and the Goldfields (Mine Australia, 2024). DWER’s policy puts dewatering statewide above 300 GL a year. The figures measure different things over different years, so treat them as orders of magnitude: Pilbara dewatering is comparable in volume to the water use of Perth and the south west.
In our view, treatment earns its place in the Pilbara only in narrower cases:
water transferred to a town or another user, which must be tested and treated for that use;
water reinjected into an aquifer of different quality, where the receiving aquifer sets the target;
water from a pit that intersects sulphide rock or saline zones, which should be kept apart from the clean surplus rather than diluted into it;
camp water supply and wastewater, a small but regulated stream at almost every remote site.
If you are planning a dewatering surplus strategy, start with the site water balance and the end user’s quality needs. Our industrial water balance tool helps with the first step, and the Water Analysis Validator checks that the bore and pit analyses behind it add up.
Salt lake brine in Western Australia: when the brine is the product
WA’s salt lakes turn the usual logic around. On a salt lake, the water is far too salty to treat economically, and the dissolved salts are the reason for the project.
A memorandum prepared by Stantec for Agrimin’s proposed Mackay sulphate of potash project on Lake Mackay, submitted with the project’s environmental review documents in September 2021, shows the scale (Lake Mackay salt balance memo):
lakebed brine typically above 270,000 mg/L total dissolved solids;
evaporation ponds expected to produce about 17 million tonnes of salts a year, around 350 million tonnes over a 20-year mine life;
waste salt stacked in piles covering about 500 ha and up to 20 m high, holding about 120 million tonnes;
at closure, pond walls breached so the residual salt dissolves back into the playa over roughly 400 years.
The project has since stalled: Agrimin announced in October 2025 that it would withdraw from Mackay after a strategic review, citing capital markets and costs, even though the project had received WA environmental approval in January 2025 (Mining Technology, October 2025). The numbers still show the scale any salt lake brine project has to plan for.
A quick hypothetical shows why treating this kind of water to fresh quality is rarely on the table. One gigalitre a year of water at 100,000 mg/L carries 100,000 tonnes of salt a year. A treatment plant cannot make that salt disappear; it can only concentrate it and hand it back as brine or solids, at a large energy cost.
Where mines elsewhere in inland WA release surplus dewatering water to salt lakes, the water in mining guideline refers proponents to a framework for assessing the cumulative impacts of dewatering discharge to Goldfields salt lakes (Outback Ecology, 2009), so the combined effect of releases is considered, not one mine at a time. For brine projects, the questions are about salt recovery, product purity and residual salt, which our pages on brine management in Australia and salt recovery from brine cover. Lithium refineries in WA are covered on our lithium refinery wastewater page.
Acid mine drainage treatment in Australia
The Australian Government’s leading practice handbook, Preventing acid and metalliferous drainage (September 2016), uses AMD to mean acidic and metalliferous drainage: acidic drainage, pH-neutral metalliferous drainage and saline drainage, all generally caused by sulphide minerals oxidising. It estimates AMD management costs at Australian operating sites at about US$100 million a year, and cites unplanned cost escalations of at least US$80 million where AMD management had to be added at closure.
State guidance points the same way: prevent first, treat what is left. Mineral Resources Tasmania’s good practice guidance says using a treatment system should be a last resort. Western Australia’s water quality protection guideline on acid mine drainage, WQPG 9 (first published 2000; page updated 2022, and still naming the agencies of that time), lists storage and evaporation, separate treatment and dilution as options, and adds a condition that is easy to overlook: salts formed during neutralisation must not threaten the environmental values where the water is released.
In our view, that condition is the one most likely to stall an AMD treatment plan. Lime neutralisation fixes the pH and drops out most metals, but with sulphate-rich drainage it often leaves water close to gypsum saturation and still high in dissolved salts. If the receiving creek cannot take that salt, the next step is desalination, which brings the solids and brine questions covered on our ZLD for mining page. For specific contaminants, see our guides to heavy metal removal and selenium removal.
Before you commit to a mine water plant
Most results for mine water treatment in Australia come from companies that sell a plant, a chemical programme or an operations contract, and they are often the right people to build and run it. Local environmental consultancies prepare the approvals. Our role sits between the two: working out which of the four problems above a site actually has, and what each stream needs, before a plant is specified. For an Australian mine that covers:
the dewatering forecast, site water balance and bore and pit analyses that any proposal will be sized on;
keeping apart streams that should not share a plan, such as clean dewatering surplus and drainage from a sulphide waste dump;
testing each destination (reuse, transfer, reinjection, controlled release, salt lake) against the licence, the management plan triggers and the DWER surplus policy;
setting treatment, MLD and ZLD options against each other with the residual salt counted;
checking vendor, EPC and build-own-operate offers against that basis before contract.
Our guide to industrial water treatment companies explains who does what, and our Australia page covers industrial sites outside mining.
Dewatering licences and town supply: two short answers
Do we need a licence to discharge dewatering water in Western Australia? If you dewater 50,000 tonnes a year or more, the premises falls in Part V category 6 and needs a works approval and licence, in addition to the 5C licence to take the water. Below that threshold, the 5C licence to take the water still applies; confirm the discharge position with DWER early.
Can surplus dewatering water supply a town? DWER’s policy lists transfer to other users, including public supply, as a preferred option for surplus water. The water has to be tested for that use, and drinking supply brings its own treatment and approvals.
What to send with a mine water question
For a first call, the useful inputs are the dewatering forecast or water balance, recent pit and bore analyses, and the licence or management plan conditions you are working to. With those we can tell you whether the question is mainly about volume, salt or acid drainage, and whether an independent review is worth commissioning. Book a scoping call or send us your project details.
Written by the Brine Consulting advisory team. The Brine Consulting advisory practice includes Dr. Christopher Fellows (Part Time Consultant) and Osis G. Kalache, P.Eng. (Senior Consultant – Wastewater Process Engineering & Optimization). Dr. Christopher Fellows is a senior water technology and physical chemistry expert with more than 30 years of combined academic and industrial research experience. A senior wastewater process engineer, Osis brings more than 17 years of experience in industrial and conventional wastewater treatment, process optimization, modular system design, and client-facing engineering delivery. Meet our experts.