There is no shortage of waste water treatment companies in the UAE. Search for one and most of what you find are supplier websites, several of them “top 10” lists in which the publisher ranks itself first. None of that tells you whether a company suits your water, your emirate or the permit your site needs. The short answer: settle the permit and residue routes first, write the numeric limits into the tender, and compare suppliers on how they will meet them.
This guide does not rank anyone, and it has no supplier to push: Brine Consulting is an independent industrial water advisory firm in Amsterdam that sells no treatment equipment, so none of the companies on your shortlist is ours. It covers what to settle before you invite bids, what to write into the tender so the offers can be compared, and the questions that show whether a supplier understands UAE permitting. For the general picture of how chemical suppliers, equipment makers, contractors and consultants each earn their money, see our guide to industrial water treatment companies and when an independent consultant pays off. This page deals with what is specific to buying in the UAE; for Saudi Arabia and the wider Gulf, see our Middle East overview.
What do UAE water treatment companies actually sell?
The UAE market splits into a handful of offers, and many companies sell several of them:
Packaged sewage and effluent treatment plants (STP and ETP) for factories, labour accommodation and commercial buildings. Our independent guide to choosing an effluent treatment plant supplier covers the ETP side in more depth.
Reverse osmosis and desalination plants, from small brackish water units to large seawater plants.
Design-build, EPC and design-build-operate contracts for larger municipal and industrial plants.
Annual maintenance and operation contracts for plants already running.
Treatment chemicals, often sold with a service visit.
Recycled water supply, where a utility or developer sells treated or polished effluent to users.
Knowing which of these you need is the first filter. A supplier of packaged STPs and a contractor that builds desalination plants can both appear under “water treatment plants in UAE”, but they are not competing for the same job.
Settle the permit route before you invite bids
In the UAE, the permit decides much of the scope, and the rules differ by emirate and, in Dubai, by zone. Agree in the tender who prepares each application and the design documents behind it, because the approval is held by the site, not by the supplier.
| Where the plant will be | What the supplier’s scope has to cover |
|---|---|
| Abu Dhabi, discharging to sewer | A design that meets Schedule A of the Trade Effluent Control Regulations 2022, and the technical content for a Trade Effluent Consent, which the sewerage collection company issues for up to three years. The 2022 edition replaced the 2010 regulations and is the one in force |
| Dubai, municipal areas | Drawings and data for Dubai Municipality’s written approval to build a treatment plant and to connect to the public network, and an effluent the Municipality can verify before industrial wastewater enters its sewer (Local Order No. 8 of 2002, Articles 4, 6 and 8; still listed as current by the Municipality, with amendments from 2005 and 2006) |
| Dubai, areas under Trakhees | Laboratory reports from an EIAC-accredited laboratory for a harbour discharge or irrigation permit (Trakhees procedure CP-02, Nov 2024) |
| A new industrial project in Dubai | Input to the Environmental Clearance study; any brine outfall needs a full EIA report (Dubai Municipality guidance, 2024) |
| Sharjah | Support for the facility’s environmental and waste disposal permits, which Sharjah Municipality checks on its inspections (Sharjah 24) |
| Ras Al Khaimah | Support for the EPDA environmental permit for industrial establishments (EPDA) |
Our page on industrial wastewater treatment in the UAE goes through these rules in more detail, including the brine routes open to each site.
Put numbers in the tender, not “compliant with UAE standards”
Many UAE supplier pages promise compliance with “UAE regulations” without naming one. A proposal can do the same. These clauses close that gap, and each one follows from a published rule.
| Clause to write into the request for proposals | Why it matters in the UAE |
|---|---|
| State the predicted effluent for every parameter in the applicable limit table, at design and peak load | Abu Dhabi’s Schedule A caps discharge to sewer at, among others, 2,000 mg/l TDS, 1,000 mg/l chloride, 1,000 mg/l sulphate and 1,000 mg/l COD. The collection company can set stricter limits in your consent |
| For any RO step, state recovery and the reject composition | Reject from a high-recovery RO can exceed the TDS and chloride limits even when the feed is well within them |
| Include a sampling point and flow metering in scope | In Abu Dhabi the collection company may require both, and online monitoring for high-risk discharges (clauses 6.2.1, 6.3.1 and 6.3.3) |
| Run acceptance tests through an accredited laboratory | Abu Dhabi requires sampling to ISO 5667-10 and analysis by an ISO/IEC 17025 accredited laboratory; Trakhees asks for an EIAC-accredited laboratory |
| Name the residue route: sludge, brine, oily waste, and the expected monthly volume of each | Tankered waste may only go to designated discharge points. Dubai Municipality has required generators to keep a waste logbook and to use tankers on a one-trip basis without mixing loads from different companies (Gulf News, 2018) |
| Say who runs monitoring and reporting after handover | In Abu Dhabi the consent can assign sampling to the site, at the site’s own cost, and the collection company may require the site to keep discharge and meter records for at least 10 years (clauses 6.1.7, 6.1.8 and 6.6.4) |
| Ask for the in-country value (ICV) certificate if your procurement scores it | See the next section |
If the plant concentrates salt, our ZLD vendor proposal checklist adds the checks for brine concentrators and crystallisers.
In-country value: a UAE scoring rule to decide on early
In 2022 the UAE began applying its National In-Country Value (ICV) programme to the procurement of all 45 federal government entities, with suppliers asked for an ICV certificate and a 25% weighting applied to it in bid evaluation. Certificates are issued by accredited audit firms. ADNOC, TAQA, Emirates Global Aluminium, Emirates Steel, Mubadala and the Emirates Nuclear Energy Corporation were among the entities the ministry named as taking part (UAE Ministry of Finance, Aug 2022).
The Ministry of Industry and Advanced Technology’s programme page still says certified suppliers gain an advantage in tender awards based on their ICV score. The 25% figure dates from 2022, so confirm the weighting your buyer uses today.
If your site belongs to one of those groups, or sells to them, check with procurement whether ICV applies before the tender goes out. A 25% weighting can decide between two technically similar offers, and an overseas technology supplier with a low score starts behind on that criterion. Decide the weighting on purpose rather than discovering it at evaluation.
Look at recycled water before you size a new plant
Recycled water is already a significant source in Dubai and Abu Dhabi, and it can change what you need to buy.
Dubai recycles about 90% of its domestic and commercial wastewater and aims for 100% by 2030. Its Jebel Ali treatment plant was expanded to 675,000 m³ a day in 2016, and Warsan to 325,000 m³ a day in 2015. In 2022, 6 million m³ of reclaimed water went to central cooling stations (The National, Aug 2023).
In Abu Dhabi, SWS reported 80% utilisation of the emirate’s recycled water in August 2023, with uses in agriculture, cooling and industry (World Oil, Nov 2023). KEZAD and SWS also announced a pilot plant in KEZAD Musaffah to polish treated effluent for industrial users, at about 20,000 m³ a day (Enterprise, May 2023).
In Dubai, using treated effluent needs a prior permit that sets the approved use and the maximum quantity (Local Order No. 8 of 2002, Articles 36 and 37), and the Municipality also lists a 2015 local order on the use of treated sewage effluent. If recycled water is available at your site, ask suppliers to price a recycled-water option next to a desalinated-water one. The feed changes the pretreatment, the RO recovery you can reach and the reject you have to dispose of, so the cheapest plant on one feed may not be the cheapest on the other. Our page on industrial water reuse in the UAE sets out the Abu Dhabi recycled water tariff and the cooling water rules in Abu Dhabi and Dubai.
Questions to ask a UAE water treatment company
Which authority approves this plant and its discharge, and which application documents will you prepare?
What is the predicted effluent against each limit in our permit, and what happens to TDS and chloride at the recovery you propose?
Which accredited laboratory will run the acceptance tests?
Where will the sludge, brine and any oily waste go, which licensed carrier will move them, and what monthly volumes have you assumed?
Which of your UAE plants treat water like ours and have run through at least one summer, and can we visit one?
Where do you hold spare parts and membranes, and who services the plant after the defects period?
If we may switch to recycled water later, does your performance guarantee cover that feed as well?
Do you hold an ICV certificate, if our procurement asks for one?
Warning signs in a UAE proposal
“Approved” or “compliant with UAE standards” with no authority, limit table or test method named.
Residue disposal “by client” or “by others” with no volumes.
An RO recovery that pushes the reject above the sewer limit, with no plan for the reject.
No accredited laboratory named for performance testing.
A self-published ranking or award offered as the main evidence of capability.
Questions UAE buyers ask
Do we need a supplier with a UAE office? Not necessarily for design or equipment, but someone has to service the plant, hold spares and answer inspectors. Ask who does that in the UAE and under which contract, and check whether your procurement scores in-country value.
Is the discharge approval the supplier’s job or ours? Approvals such as an Abu Dhabi Trade Effluent Consent or a Dubai Municipality approval are tied to the site. The supplier can prepare the technical content, but the contract should say who applies, who pays for testing and what happens if the authority asks for changes.
We are in a free zone. Does that change anything? It can change who approves the plant and which documents the supplier has to produce. If the plot is under Trakhees, put the Trakhees permit and its EIAC-accredited laboratory report in the supplier’s scope. Confirm the authority with your zone before the tender; our UAE page explains how to check.
When an independent review is worth it
If you have offers that do not line up, a reuse or brine question still open, or a permit that will not accept what the plant is designed to discharge, the time for an independent review is before award, while scope and terms can still change. We review offers for UAE sites remotely, from the bid documents, water analysis and permit conditions you share; you can also email christos@brineconsulting.com. Book a scoping call or send us your project details.
Written by the Brine Consulting advisory team. The Brine Consulting advisory practice includes Osis G. Kalache, P.Eng., a senior wastewater process engineer with more than 17 years of experience in industrial and conventional wastewater treatment, process optimization and modular system design, and Dimitra Aravani, a senior industrial wastewater and reuse consultant with more than a decade of experience delivering water efficiency, reuse and resource recovery projects. Meet our experts.