Industrial water reuse in California runs under two different sets of rules. If you buy recycled water from a utility, Title 22 tells you which grade you need for each use, and the sections covering cooling and process water have stood since 2000. If you recycle your own wastewater, you create a concentrate, and where that concentrate can go depends on where the plant sits. A coastal plant, a plant in the Inland Empire and a plant in the Central Valley face three different answers, and that answer decides whether a reuse project ends with a sewer connection or with zero liquid discharge.

Brine Consulting is an independent industrial water advisory firm in Amsterdam. We sell no treatment equipment, which matters here: in our view the right answer for a California plant can be a sewer connection or a Brine Line permit rather than new equipment. We work on California sites remotely or through a defined engagement, from your water analyses, your discharge permit and the supplier offers you hold. Permits and the relationship with your regional water board, sanitation agency or SAWPA stay with your California engineers.

Buying recycled water: what Title 22 asks of industrial users

California’s Water Recycling Criteria set the minimum treatment level for each use of recycled municipal wastewater. For the two industrial uses that matter most:

  • Cooling. Cooling towers, evaporative condensers or anything else that creates a mist need disinfected tertiary recycled water. Where the cooling system serves air conditioning and its mist could reach employees or the public, it also needs a drift eliminator whenever it runs and a chlorine or other biocide to limit Legionella. Cooling without mist needs at least disinfected secondary-23 water (22 CCR 60306).

  • Process water. Industrial process water that may contact workers needs disinfected tertiary water; water that will not contact workers needs at least disinfected secondary-23 (22 CCR 60307).

Both sections have been operative since December 2000. Supply is well established in some regions: the Los Angeles County Sanitation Districts, for example, run 10 water reclamation facilities whose recycled water serves more than 880 sites, industrial processes among them (LACSD).

Title 22 grades are written around public health, not process chemistry. Tertiary recycled water still carries the dissolved salts of the sewage it came from, so a plant using it for boiler feed or high-cycle cooling usually adds its own RO step. That step is where the concentrate question starts again.

Recycling your own wastewater: the concentrate decides

Recycling process water or cooling tower blowdown inside the plant does not create a new outlet. The concentrate still has to leave the site under a sewer permit, a discharge permit or a hauling contract, or be evaporated to solids. That is why California reuse projects are usually decided on the brine side. For the general engineering of reuse systems, see our guide to industrial water reuse systems and our industrial water balance tool.

Where the concentrate can go, by region

On the coast, concentrate usually goes to the sewer and leaves through the treatment plant’s ocean outfall. In the Inland Empire it can go to the Brine Line. In the Central Valley there is no regional outlet, and that is where ZLD enters the discussion.

Where the plant is Usual outlet What decides it
Coastal, served by a treatment plant with an ocean outfall City sewer, then the treatment plant’s ocean outfall The treatment plant’s pretreatment permit and local limits, including any limit on total dissolved solids
Inland Empire and the upper Santa Ana watershed SAWPA’s Inland Empire Brine Line, by direct connection or by truck to a collection station; it ends at OC San’s plant and the Pacific A SAWPA industrial discharge permit under its Ordinance No. 8, with standard local limits under Resolution 2017-11
Central Valley No regional brine export line The Central Valley Water Board’s Salt Control Program (see below)
Anywhere with suitable geology Class I injection well EPA Region 9, which issues Class I permits in California; the state agency CalGEM holds primacy for Class II oil and gas wells and geothermal (EPA Region 9 UIC, updated 29 October 2026)
Anywhere ZLD: evaporation and crystallization to solids Energy, capital and a landfill for the salt

The Brine Line is the most distinctive of these. SAWPA describes a 93-mile line with 30 MGD of capacity, developed in 1975, that removes about 500,000 pounds of salt a day from the watershed (SAWPA). Its August 2026 permit fact sheet template shows how it treats salt: total dissolved solids is a billing parameter with no limit, while a discharger that runs PFAS treatment must monitor PFOS and PFOA at least quarterly, at OC San’s direction; neither agency has set PFAS local limits yet (SAWPA permit template, August 2026). In other words, the Brine Line prices salt instead of refusing it, but it is starting to look hard at trace contaminants.

The Ocean Plan brine rule: what it covers and what it does not

Desalination brine disposal in California is governed by the State Water Board’s Ocean Plan. The current edition is the 2019 Ocean Plan (State Water Board, page updated 24 April 2026). Its desalination provisions were adopted on 6 May 2015 and approved by the Office of Administrative Law on 28 January 2016.

The core requirements (Ocean Plan 2019, chapter III.M):

  • Salinity limit. Discharges must not exceed a daily maximum of 2.0 parts per thousand above natural background salinity, measured no further than 100 metres horizontally from each discharge point (State Water Board desalination FAQ, updated June 2024). A facility can ask for a larger alternative mixing zone; the Carlsbad plant’s request was for up to 200 metres (San Diego Water Board, August 2016).

  • Preferred method. Mixing brine with wastewater that gives enough dilution is the preferred technology. Multiport diffusers come next, and other methods are allowed only if they cause comparable marine life mortality.

  • Commingled discharges. When desalination brine is mixed with wastewater, compliance may be measured after mixing if the wastewater discharger accepts responsibility.

The point many industrial readers miss is the scope. Chapter III.M applies to seawater desalination facilities and to wastewater plants that take their brine. Concentrate from an industrial reuse plant is not seawater desalination brine. It reaches the ocean through a city treatment plant or the Brine Line, under their permits and local limits. The Ocean Plan still matters indirectly: a coastal treatment plant that already receives desalination brine has to manage the combined salinity at its outfall.

The State Water Board held a scoping meeting on 28 October 2024 on possible amendments to the seawater desalination provisions, covering 11 topics from subsurface intakes to mortality reporting for commingled discharges. Its desalination page, last updated 6 March 2026, lists no adopted amendment (State Water Board desalination page; scoping presentation). For other regions’ brine limits, see our comparison of brine discharge regulations; for the marine side, desalination environmental impact.

Central Valley: why reuse concentrate rarely fits the simple salt pathway

The Central Valley Water Board’s Salt Control Program applies to permittees whose permits limit salinity. Each must file a Notice of Intent within six months of receiving a Notice to Comply and choose one of two pathways (Central Valley Water Board guidance):

  1. Conservative Permitting Approach. The discharge must stay at or below 700 µS/cm electrical conductivity as a monthly average where agricultural supply is the use to protect, or 900 µS/cm as an annual average for municipal supply, unless a site-specific objective applies. The guidance itself says most permittees do not meet these thresholds.

  2. Alternative Permitting Approach. The permittee pays an annual fee to take part in the Prioritization and Optimization (P&O) Study run by the Central Valley Salinity Coalition.

Using the guidance’s own conversion (TDS divided by 0.64 gives EC), 700 µS/cm is about 450 mg/L of dissolved solids and 900 µS/cm about 575 mg/L. Any RO concentrate is far above that. So for a Central Valley plant the real choice is between the P&O pathway, a Class I well where the geology allows one, or ZLD. There is no quick fix on the horizon: in a November 2025 progress report, Maven’s Notebook reported the program still in the first of three phases, about 11% of permittees noncompliant, and the Water Board’s executive officer describing an out-of-valley brine line as “decades out” (Maven’s Notebook, 24 November 2025).

A worked example: one reuse project in three California locations

This is a hypothetical case with stated assumptions. A plant recycles 0.5 MGD of process wastewater at 1,000 mg/L total dissolved solids through RO at 80% recovery, and the membranes reject essentially all of the salt. It gets 0.4 MGD of permeate back and 0.1 MGD of concentrate at about 5,000 mg/L. The salt load is 0.5 × 1,000 × 8.34 = 4,170 lb a day, about 2.1 short tons, or roughly 760 tons a year.

Location Where the 0.1 MGD goes What to check first
Coastal city with an ocean outfall City sewer under the pretreatment permit Whether the city sets a TDS local limit. SAWPA’s permit template uses 550 mg/L as an example of one; a 5,000 mg/L concentrate would need a variance or a different outlet. Also ask whether the city recycles its effluent, because your salt then returns in its recycled water
Inland Empire Brine Line, direct or trucked Billing on volume and TDS; PFOS and PFOA monitoring if you run PFAS treatment. The 4,170 lb a day is under 1% of the salt the line removes
Central Valley Neither sewer nor surface water is likely to take it At roughly 7,800 µS/cm (5,000 ÷ 0.64), the concentrate is about 11 times the 700 µS/cm conservative threshold. Expect the P&O pathway, a Class I well if geology allows, or ZLD leaving about 2 tons of salt a day

The EC figure uses the guidance’s 0.64 factor; at brine salinity the true ratio differs, so treat it as an order of magnitude. The lesson holds: the same reuse plant is a simple sewer project in one county and a ZLD project in another. Test your own figures with our MLD vs ZLD screener, and see our brine disposal options compared and deep well injection explainers.

Why reuse keeps moving up the agenda

  • Colorado River. Under the 2027-2028 Operating Guidelines issued on 21 August 2026, California’s share of the 2027 Lower Basin cut is 440,000 acre-feet if the Lower Basin states implement their proposed sharing agreement (Reclamation).

  • State targets. The State Water Board’s Recycled Water Policy aims to raise recycled water use from 714,000 acre-feet a year in 2015 to 2.5 million by 2030 (Recycled Water Policy, 2018 amendment).

  • Potable reuse. Direct potable reuse regulations took effect on 1 October 2024 after Office of Administrative Law approval on 6 August 2024 (WateReuse, August 2024). Utilities planning potable reuse have a stronger interest in what industrial users put into the sewer. Our page on direct potable reuse versus industrial reuse compares the two.

Where independent advice fits in a California reuse project

California has no shortage of engineering firms and treatment suppliers, and you will need them for permits, design and construction. An independent adviser works upstream:

  • checking the water analyses and site water balance before a reuse system is sized on them

  • deciding between buying Title 22 recycled water and recycling your own, with the salt followed to its final outlet

  • testing the sewer, Brine Line, Class I and ZLD options open at your address before anyone prices a crystallizer

  • reading supplier and EPC offers for exclusions, recovery guarantees and who holds the concentrate

  • independent technical due diligence on California water assets for lenders, buyers and boards

If a supplier has already proposed ZLD, start with our ZLD vendor proposal checklist or a ZLD feasibility study. Our services: water reuse and ZLD systems, water treatment and ZLD consulting and advisory and due diligence. For other states, see our USA overview, Texas and semiconductor ZLD in Arizona.

Is zero liquid discharge required in California?

Not as a general rule. ZLD becomes the practical answer where no outlet will take the concentrate: most often inland, and especially in the Central Valley, where the conservative salt thresholds sit far below any RO concentrate and no export line exists.

Check your outlet before you size the plant

Tell us where the plant is, what the concentrate looks like and what your sewer or Brine Line permit allows. A scoping call is usually enough to see whether your project is a sewer connection, a Brine Line permit or a ZLD plant. Book a scoping call, send us your project details or write to christos@brineconsulting.com.

Written by the Brine Consulting advisory team. The Brine Consulting advisory practice includes Ghazi Ozair, Senior Consultant for Desalination, Water Treatment and Marine Ecosystems, with more than 45 years of global experience across membrane and thermal desalination, wastewater treatment, produced water, marine protection and water quality management, and Dimitra Aravani, External Advisor for Industrial Wastewater and Water Reuse, with more than a decade of experience delivering water efficiency, reuse and resource recovery projects for industrial and municipal clients. Meet our experts.