Desalination brine management in Saudi Arabia: who controls the brine, the discharge rules and what valorization can recover

Home Desalination brine management in Saudi Arabia: who controls the brine, the discharge rules and what valorization can recover

Desalination brine management in Saudi Arabia works at a scale no other country matches. The Saudi Water Authority (SWA) calls the Kingdom the world’s largest producer of desalinated water, with output of more than 11.1 million cubic metres a day. The Saline Water Conversion Corporation (SWCC) has said its own plants produce more than 4 billion m3 of brine a year, and a 2019 UN University study put Saudi Arabia’s share of world brine production at 22%. Saudi Arabia, the UAE, Kuwait and Qatar together produce 55%.

Most of that brine goes back to the Red Sea or the Gulf through permitted outfalls. The short answers: at former SWCC plants the brine sits with the Saudi Water Authority, which runs a mineral extraction service; at privately financed plants it sits with the project company and its contract with the state water buyer. Discharge to sea is regulated by the National Center for Environmental Compliance (NCEC) under the aqueous media and marine and coastal regulations, the second updated in August 2026, except inside the Royal Commission cities, where their own regulations apply. Several brine mining projects have been announced, but we found little published production data. The sections below set out the evidence for each answer, with sources checked on 4 November 2026.

For the UAE and the wider Gulf, see our Middle East overview. Industrial brine and zero liquid discharge (ZLD) at factories and petrochemical sites are covered in our guide to water treatment companies and ZLD consulting in Saudi Arabia. The process chemistry of recovering minerals is covered in mineral recovery from desalination brine.

Brine Consulting is an independent industrial water advisory firm in Amsterdam. We sell no treatment equipment, which matters on a topic where many published claims come from technology suppliers and project sponsors.

Who runs Saudi desalination now, and who you deal with about the brine

The sector changed shape in May 2024, when SWCC was restructured into the Saudi Water Authority, which now regulates the water sector. The former SWCC plants are run by Water Desalination, which SWA describes as its “transitional operational arm”. In August 2026 Water Desalination handed management of a portfolio of groundwater and surface water desalination plants to Al Holol Water Desalination Company, Gulf Daily News reported. New capacity is mostly procured from private developers by the Saudi Water Partnership Company (SWPC), which has operated under the name Sharakat since February 2026 (MEED) and aims to raise private participation in desalinated water production to 100% by 2030, according to the US Commercial Service guide to the Saudi water sector (May 2026).

That split decides who you negotiate with if you want to treat, reuse or buy brine.

Type of plant Example Who you deal with about the brine Check first
Former SWCC plants, now run by SWA SWCC named its Jubail, Yanbu and Ras Al Khair plants as sources for brine mining agreements in 2022 SWA, through its mineral extraction service, which has a request form for companies Whether the plant’s brine is already committed to an earlier agreement
Independent water plants (IWPs) procured by SWPC Ras Mohaisen: 300,000 m3/day seawater reverse osmosis (SWRO) on the Red Sea near Al-Qunfudhah, build-own-operate, commercial operation expected by the second quarter of 2028 (MEED, February 2025) The private project company, and SWPC as the buyer of the water Who holds the rights to the brine, and to any revenue from it, under the water purchase agreement
Any plant inside a Royal Commission city Jubail, Yanbu, Ras Al-Khair and Jazan City for Primary and Downstream Industries are administered by the Royal Commission for Jubail and Yanbu (RCJY) The plant operator, with RCJY as environmental regulator The Royal Commission Environmental Regulations (RCER) edition and permit that apply (see the rules section below)
NEOM A brine processing plant to be integrated with a NEOM desalination plant NEOM, which says it wants partners to build, operate and maintain the plant Pilot status under the NEOM and Engie memorandum of May 2025, and what is left of the plan after NEOM’s 2026 restructuring (see the valorization table below)

More IWP capacity is in the pipeline. A list of seven public-private partnership desalination projects from the National Center for Privatization, with launch dates running from 2024 to 2035, includes Ras Al Khair 2 (600,000 m3/day) and Ras Al Khair 3 (400,000 m3/day) on the Gulf, and Shuqaiq 4, Rabigh 5 and Jazan on the Red Sea, all under 25-year build-own-operate contracts (reported by Zawya). Check each project’s current stage with SWPC before planning around it. Each one is a future brine stream whose rights will sit in a project contract, so the time to raise brine use is before those contracts are signed.

Red Sea or Gulf: where the discharge risk actually sits

The two coasts start from similar salinities. KAUST’s Policy Institute gives average Red Sea salinity as 40 parts per thousand. A 2022 review in Frontiers in Marine Science describes the Gulf as a shallow, semi-enclosed sea with an average depth of 35 m and salinity of 39 psu.

A common worry is that desalination is making the whole Gulf saltier. A 2022 modelling study by New York University Abu Dhabi researchers in Scientific Reports found that Gulf-wide salinity increases from desalination, even under worst-case climate projections, stay within the normal seasonal variation organisms are already exposed to (as reported by Aquatech). That is a modelled, basin-scale result. It says nothing about the water a few hundred metres from an outfall, which is where permits and impact studies focus.

The near-field evidence is less reassuring. KAUST’s April 2026 policy brief on Red Sea coral reefs recommends keeping reef exposure to brine below 10% above ambient salinity. In the experiments behind it, lethal effects began at 13.8% and 19.6% above ambient for the two coral species tested, and the brief suggests a shallower discharge angle of 30 to 45 degrees to improve dilution. In our view, where reefs lie near a planned outfall, its siting and diffuser design deserve as much attention as the treatment plant.

The technology mix changes what is in the brine. Membrane plants now make up 50% to 60% of Saudi capacity, while thermal plants still account for about 70% across the Gulf states (US Commercial Service, May 2026). The Frontiers review explains the difference: thermal (MSF) brine is warmer and generally less saline than reverse osmosis brine, and copper from thermal plant alloys turns up more often in it, while RO brine carries phosphonate antiscalants and iron or aluminium coagulants. When an SWRO plant replaces a thermal one at the same site, we would expect a saltier, cooler discharge in which antiscalants rather than heat and copper become the main additive question.

Which discharge rules apply in November 2026?

Desalination brine discharged to sea falls under national environmental rules administered by the National Center for Environmental Compliance (NCEC), except inside the Royal Commission cities.

Rule Current edition and date What it means for brine
Environment Law Royal Decree M/165 of 19/11/1441 AH (2020); its executive regulations are issued by the Ministry of Environment, Water and Agriculture (MEWA) The legal basis for the regulations below
Executive Regulation for the Protection of Aqueous Media from Pollution Ministerial Decision 603639/1/1442 (2021), applied by MEWA from July 2021; its violations and penalties table was amended in September 2024 Permits for discharges to water, effluent standards, and rules for outfalls and mixing zones
Executive Regulation for the Sustainable Management of the Marine and Coastal Environment Updated version approved by MEWA (decision dated 20/02/1448 AH) and published in the official gazette, Umm Al-Qura, in August 2026; it replaces the 1443 AH version Activities affecting the sea and coast. Permit conditions and impact studies written under the 1443 AH version should be re-checked against the new text
Royal Commission Environmental Regulations (RCER) RCER-2015 is the latest edition whose text is publicly available; RCJY has referred to an updated edition, RCER-2025, in correspondence dated 28 May 2025 Inside Jubail, Yanbu, Ras Al-Khair and Jazan City for Primary and Downstream Industries, RCER sets the permits and the coastal discharge standard (Table 3C in the 2015 edition). Ask RCJY which edition applies

For a plant in Jubail, our page on industrial wastewater treatment in Jubail explains the RCER tables in more detail. For a comparison with other countries, see brine discharge regulations by region.

Brine valorization in Saudi Arabia: what has been announced, and what is confirmed

Brine valorization means turning brine into products: salt, bromine, magnesium and calcium compounds, potassium, and in principle lithium. Saudi Arabia has announced several such projects. Published production data is much thinner than the announcements.

Date Who What was announced Status in public sources, November 2026
Ongoing SWA (service page on the SWCC website) Mineral extraction service for companies interested in magnesium, calcium, sodium chloride, bromine, lithium, potassium and sulfate from desalination brine Open, with a request form; no published terms or fees
2025 report SWA research institute (WTIIRA) A nanofiltration plant at Shoaibah that supplies magnesium-rich brine for drinking water post-treatment, and a demonstration plant at Haql designed for 2,000 t a year of sodium chloride and 2 t a year of bromine (SWA brine mining report) Shoaibah launched, per the report; Haql described in the same report as under construction
May 2025 NEOM and Engie Memorandum of understanding to test and set up pilot installations for brine management, using membranes and crystallisation (MEED) No capacity, timeline or products published
May 2024 ENOWA (NEOM) Ended its development agreement with Itochu and Veolia for a ZLD desalination plant of 500,000 m3/day in its first phase, which would have turned brine into industrial salt, bromine, boron, potassium, gypsum and magnesium (MEED) Cancelled; ENOWA cited changing water needs. MEED reported in October 2024 that the brine complex was rescoped to a 1.2 MLD pilot at Duba and a 50 MLD first phase taking brine from a planned 150,000 m3/day SWRO plant. NEOM cancelled that SWRO plant in March 2026, which a MEED source linked to a complete restructure of NEOM; no new date for the brine complex has been published
January 2024 SWCC Two brine mining plants at Ras Al Khair with Chinese partners, operation targeted for the first quarter of 2026; brine mining investment projected at about SAR 8 billion by 2030, to meet 25% to 40% of local demand (Asharq Al-Awsat) We found no public report of production starting
November 2022 SWCC Agreements with local and international companies to recover bromine, lithium, potassium, magnesium, calcium and sodium at Jubail, Yanbu and Ras Al Khair; bromine output expected to reach 16,000 tonnes by 2024, 30% of local demand (Mining Digital) No published production figures found

SWA’s research arm is also working on process routes. An SWA researcher has described a dual brine concentration design that combines nanofiltration, reverse osmosis and membrane brine concentration to split brine into a stream for high-purity sodium chloride and bromine and a stream for calcium and magnesium salts (opinion article in Arab News, November 2024).

Our reading of this record is that rights, offtake and purity are as much the bottleneck as technology. Our ZLD guide chapters on markets, offtake and logistics and purity specification and qualification cover those steps.

Worked example: what is in the brine from a Saudi SWRO plant

This is a hypothetical calculation from published seawater chemistry, not plant data.

Assumptions

  • Red Sea seawater at 40 g/kg, the KAUST average.

  • Seawater intake of 250,000 m3/day. At 40% recovery this gives 100,000 m3/day of product water and 150,000 m3/day of brine.

  • Ions in the same proportions as standard seawater, using the Britannica table of principal constituents (given at salinity 34.7) scaled by 40/34.7. Lithium at 0.17 mg/L in surface seawater, from Mohd Nani et al. (2016), Table 2, scaled the same way.

  • g/kg treated as g/L, which understates the masses by about 3%. Salt in the product water ignored.

Result. The plant takes in 10,000 tonnes of dissolved salt a day (250,000 m3 × 40 kg/m3) and sends almost all of it out in 150,000 m3/day of brine at about 67 g/L, 1.67 times the seawater concentration. The minerals in that brine:

Constituent Concentration in the seawater (g/L) Mass in the brine per day Mass per year
Sulfate 3.09 772 t 282,000 t
Magnesium 1.47 368 t 134,000 t
Calcium 0.47 118 t 43,000 t
Potassium 0.46 114 t 42,000 t
Bromide 0.076 19 t 7,000 t
Boron 0.0051 1.3 t 460 t
Lithium 0.000196 (0.196 mg/L) 49 kg 18 t (about 95 t lithium carbonate equivalent)

Three things follow.

  1. Recovery changes concentration, not tonnage. Run the same intake at 50% recovery and the plant makes 125,000 m3/day of water and 125,000 m3/day of brine at 80 g/L. The minerals in the brine are the same. More product tonnage needs more seawater through the plant, or brine pooled from several plants.

  2. Bromine needs several large plants. SWCC’s 2022 target of 16,000 tonnes of bromine a year equals all the bromide passing through about 2.3 plants of this size, at 100% capture. Real capture is lower, so a bromine business at that scale has to draw on brine from several large plants.

  3. Lithium is a by-product, not a driver. At full capture, a 100,000 m3/day plant offers about 49 kg of lithium a day. In our assessment, lithium at this concentration only makes sense if other products carry the cost of concentrating the brine. Our article on lithium from brine explains why concentration matters so much.

One more point is easy to miss: taking products out changes what goes back to sea. A plant that removes magnesium and calcium returns a brine with a different composition and volume, and the discharge permit has to cover that. Run your own figures with the Brine Concentration Factor Calculator and the Brine Mass Balance Calculator.

What to settle before you design or invest

  1. Real brine data. Get the plant’s brine analysis over at least a full year, not a figure scaled from seawater. Gulf and Red Sea intakes vary with season and site. Check each analysis with our Water Analysis Validator before anyone sizes equipment from it.

  2. Rights to the brine. For a former SWCC plant, that means SWA. For an IWP, it means the project company and SWPC, and a supply term that matches the life of your recovery plant.

  3. The permit for the return stream. Confirm whether NCEC or RCJY permits the discharge, which edition of the rules applies, and how your plant changes the volume and composition going back to sea.

  4. Offtake and purity. Know who buys each product in the Kingdom, at what purity, and in what form before choosing a process. The valorization hierarchy in our ZLD guide sets out the order in which to test this.

  5. The residual. Every recovery train leaves a final stream. Price its route from the start: our comparison of brine and desalination brine disposal options covers the choices, and our brine disposal cost guide the cost drivers.

Where independent advice fits on a Saudi brine project

The decision most readers of this page face is whether a brine proposal at a Saudi plant, be it a discharge design, a recovery plant or an offtake deal, holds up before money or contract terms are committed. Brine Consulting checks that case from Amsterdam, remotely or through a defined engagement, using the plant’s own brine data and drawings and working alongside your local permitting consultant. In practice that means a brine mass balance, a screen of which products are worth recovering at that plant’s concentrations, and an independent review of the technology or offtake case. See our brine resource recovery and advisory and due diligence services.

Our expert network includes two former SWCC desalination experts (SWCC is now part of the Saudi Water Authority), alongside specialists in brine crystallization and the impact of desalination discharges.

Talk to us before you commit to a brine project

If you have a valorization or brine discharge proposal for a Saudi plant and want it checked against the plant’s actual brine, the contract rights and the current discharge rules, send us what you have. Book a call with Christos Charisiadis, send us your project details or email christos@brineconsulting.com.

Written by the Brine Consulting advisory team. The Brine Consulting advisory practice includes Dr. A. Mohammed Farooque, a senior desalination and membrane technology expert with more than 30 years of experience in seawater desalination research, who spent 29 years at Saudi Arabia’s Saline Water Conversion Corporation (SWCC), now the Saudi Water Authority, where he was Head of the Seawater Reverse Osmosis (SWRO) Research Group, and Dr. Christopher Fellows, a senior water technology and physical chemistry expert with more than 30 years of combined academic and industrial research experience, who spent much of the past decade as a Senior Water Expert at SWCC. Meet our experts.

Questions about your site's water or brine?

Tell us briefly what you are working on and one of our experts will get back to you.