Produced water discharged from Brazil’s offshore platforms is governed by one national rule: CONAMA Resolution 393 of 8 August 2007, applied platform by platform through IBAMA’s operating licences. Its core limit is an oil and grease content (TOG) of up to 29 mg/L as a simple monthly average and 42 mg/L on any single day, measured by a gravimetric method. That rule now matters mostly offshore in the pre-salt, which supplied 82.4% of Brazil’s oil and gas production in July 2026 (our calculation from the tables in ANP monthly production bulletin no. 191).
Brine Consulting is an independent industrial water advisory firm in Amsterdam that sells no treatment equipment, so we can review a package guarantee or a run of TOG exceedances without a de-oiling system of our own to propose. We work with operators, FPSO contractors and investors on Brazilian offshore units remotely or through a defined engagement.
Who regulates produced water offshore Brazil?
CONAMA sets the discharge standard, IBAMA applies it unit by unit through operating licences, and ANP regulates production but not the discharge limit.
| Body | Role for produced water | Current instrument |
|---|---|---|
| CONAMA (National Environment Council) | Sets the discharge standard for platforms | Resolution 393/2007, in force since publication on 9 August 2007; listed by FAOLEX as neither amended nor repealed, and we found no replacement when we checked on 4 November 2026 |
| IBAMA (federal environmental agency) | Licenses each offshore production unit, sets its conditions and receives the monitoring reports | Platform operating licences, for example LO 1751/2026 for FPSO P-79 at Búzios, signed 29 March 2026 |
| ANP (National Agency of Petroleum, Natural Gas and Biofuels) | Regulates exploration and production and publishes production data | Monthly production bulletins; the discharge limit itself sits with CONAMA and IBAMA |
IBAMA’s licences turn the resolution into site obligations. The licence for P-79 requires Petrobras to notify IBAMA within five days of starting produced water discharge, with the start date and time, the calibration of the TOG control system and evidence that the treatment system works (LO 1751/2026, condition 2.6). The 2019 licence for P-77, also at Búzios, carries the same condition (LO 1512/2019, condition 2.5). Monitoring then flows back to IBAMA each year: Petrobras’s March 2022 submission for three Santos Basin pre-salt FPSOs (Cidade de São Paulo, Cidade de Paraty and Cidade de Mangaratiba) attached CONAMA 393 monitoring reports for each unit and an annual pollutant load declaration under CONAMA Resolution 430/2011 (Petrobras letter to IBAMA, 28 March 2022).
What does CONAMA 393 require?
Beyond the 29 and 42 mg/L oil and grease limits, CONAMA 393 fixes how results are averaged, the test method, daily sampling, a six-monthly list of metals, radionuclides and organics, and where a platform may not discharge at all.
| Requirement | What the resolution says | Article |
|---|---|---|
| Oil and grease limit | Up to 29 mg/L as a simple arithmetic monthly average, with a daily maximum of 42 mg/L | Art. 5 |
| Exceedances | Immediate notice to the agency; a non-conformity report within 30 days for a monthly exceedance | Art. 5 §2 and §3 |
| Test method | Gravimetric; the agency may accept other methods that show a statistically significant correlation with it | Art. 6 and §1 |
| Sampling | Daily samples, each made of four grabs at standard times | Art. 6 §2 |
| Six-monthly monitoring | Arsenic, barium, cadmium, chromium, copper, iron, mercury, manganese, nickel, lead, vanadium, zinc; radium-226 and radium-228; PAHs, BTEX, phenols and total petroleum hydrocarbons; chronic toxicity to marine organisms; TOC, pH, salinity, temperature and total ammonia nitrogen | Art. 10 |
| Mixing zone | Limited to a 500 m radius from the discharge point | Art. 4 |
| Near-shore platforms | Within 12 nautical miles of the coast, conditions are set from a dispersion study, preferably zero discharge | Art. 8 |
| Protected areas | No discharge within 10 km of conservation units or 5 km of ecologically sensitive areas | Art. 9 |
| Upsets | Temporary exceptions only under an approved programme and schedule | Art. 7 |
Article 14 called for limits on the six-monthly substances and radioisotopes to be set in a separate resolution. Check your licence conditions for any specific values that apply to your unit.
Why the test method matters as much as the number
CONAMA 393 asks for a gravimetric method, and “gravimetric” covers more than one procedure. In February 2018, Estadão reported that Petrobras would pay, or ask to convert into environmental services, a R$14.28 million IBAMA fine that followed an inspection finding problems with produced water discharge from the P-51 platform. According to the report, IBAMA’s position was that platforms must use Standard Methods SM 5520 B, while P-51 had used SM 5520 F, also a gravimetric method. Petrobras told the paper that IBAMA had changed in 2015 rules applied since 1986 (Estadão report via Tribuna do Paraná, 5 February 2018).
The practical effect was described in 2019 by Lisa Henthorne, then president of the Produced Water Society and an executive at treatment supplier Water Standard. She told Offshore Engineer that operators could previously use a method that did not pick up polar hydrocarbons, and from the first quarter of 2020 would have to use one that does, so water that passed before could fail at the same ppm limit (Offshore Engineer, 28 June 2019).
The same caution applies when you compare Brazil with other regions:
| Regime | Limit | How the average is calculated | What is measured |
|---|---|---|---|
| Brazil, CONAMA 393/2007 | 29 mg/L monthly, 42 mg/L daily | Simple arithmetic mean of daily results | Oil and grease by a gravimetric method |
| United States offshore, 40 CFR 435.13 (eCFR, current to 9 July 2026) | 29 mg/L 30-day average, 42 mg/L daily maximum | Average of daily values over 30 consecutive days | Oil and grease |
| North-East Atlantic, OSPAR Recommendation 2001/1 as amended | 30 mg/L | Flow-weighted monthly average | Dispersed oil by the OSPAR reference method |
The numbers look alike, but the results are not interchangeable. A treatment package with a strong North Sea record was proven against dispersed oil on a flow-weighted basis. In Brazil every day’s result counts equally, whatever the flow, and the test weighs extracted oil and grease rather than measuring dispersed oil by the OSPAR reference method. Ask any supplier which method its performance data used.
Can an online oil-in-water analyser replace the lab method?
Not for compliance, unless the agency accepts it. CONAMA 393 lets the agency accept other methods only if they correlate statistically with the gravimetric method, so online analysers are mainly a control tool. Compliance results follow the method your licence and IBAMA accept, so calibrate the online signal against it.
What makes pre-salt produced water different
Far offshore, so the open-sea regime applies. The pre-salt lies roughly 55 to 300 km from the coast (Mein et al., Energies, 2021), well beyond the 12 nautical miles (about 22 km) that trigger CONAMA 393’s near-shore rule. Discharge is allowed within the resolution’s limits, which puts the weight on treatment performance and monitoring.
CO2-rich and high in calcium. CO2 in pre-salt associated gas can exceed 20% in some areas, and the water can carry calcium in the order of 10,000 ppm, according to a 2023 University of São Paulo doctoral thesis on calcium carbonate scaling in simulated high-salinity produced water (de Angelo, EP-USP, 2023). Petrobras describes its HISEP system for the Mero field as reinjecting gas containing 45% CO2 back into the reservoir (Petrobras pre-salt page). When pressure falls through the separators and hydrocyclones, CO2 leaves the water, pH rises and calcium carbonate can deposit in the very equipment that removes the oil.
Two discharges, not one. Seawater for injection passes through a sulfate removal unit that cuts its sulfate content so it can be injected into the wells, and that unit’s reject is discharged alongside produced water. Mein et al. assess both effluents together in their environmental review.
Large flows on each unit. The produced water package for P-82 at Búzios was designed for 33,600 m³ a day, with five hydrocyclone vessels and two gas flotation units, taking an inlet of 1,000 ppm oil down to a guaranteed discharge maximum of 29 ppm, according to a newsletter from Fluxo, which describes package supplier Alderley as its partner (Fluxo newsletter, supplier-written, June 2023).
For scale, Petrobras reported that in 2022 it discharged about 76,873 megalitres of produced water and reinjected 53,207 megalitres for secondary recovery, with a total oil and grease load in the discharged water of about 1.3 thousand tonnes (Petrobras Sustainability Report 2022, water and effluents). The report does not break these out by basin or for the pre-salt, so read them as company-level figures, not pre-salt data. Our arithmetic on them: about 41% of the produced water disposed of was reinjected, and the load-weighted average oil content of the discharged water was roughly 17 mg/L.
Worked example: how much headroom does a 29 mg/L guarantee leave? (hypothetical)
Because CONAMA 393 averages daily results without weighting by flow, you can work out how many bad days a month can absorb. Assumptions: a 30-day month, one TOG result per day, and upset days running at 38 mg/L, below the 42 mg/L daily maximum.
| Normal daily result | Upset days at 38 mg/L before the monthly average passes 29 mg/L | Check |
|---|---|---|
| 20 mg/L | 15 | (15 × 20 + 15 × 38) ÷ 30 = 29.0 |
| 27 mg/L | 5 | (25 × 27 + 5 × 38) ÷ 30 = 28.8; a sixth day gives 29.2 |
A plant that runs close to 29 mg/L in normal operation has almost no room for upsets, and any single day above 42 mg/L is an exceedance regardless of the average. So a supplier guarantee of “29 ppm maximum” sits exactly at the monthly limit and leaves the margin to you. When you write the specification:
set the guarantee as a normal operating value well below 29 mg/L, plus a daily maximum below 42 mg/L, across the full inlet range;
tie the guarantee to the same gravimetric method that your licence uses;
ask how performance holds at end-of-life water cuts and with the chemicals you plan to dose;
agree the test period, sampling points and what happens if the package falls short.
Our ZLD vendor proposal checklist was written for a different technology, but its approach to guarantees, test periods and exclusions carries over to produced water packages.
Discharge or reinjection?
Reinjecting produced water into the reservoir is often described as the better environmental outcome, but it is not always technically or economically viable, which is why discharge at sea remains common (Viana Junior et al., Latin American Journal of Energy Research, 2023). Reinjection also changes the treatment target: Offshore Engineer’s 2019 report notes it may require removing more suspended solids than overboard discharge. The questions that decide it:
Injectivity. What solids and oil levels can the injection wells tolerate over years, not weeks?
Compatibility. What happens when produced water meets injected seawater or sulfate removal unit permeate in the reservoir and in the wells? Sulfate scales become more common later in field life as injected seawater breaks through, according to the USP thesis cited above.
Scale in the topsides. With CO2 and calcium at pre-salt levels, a reinjection loop needs its own scale control plan.
Licence and reporting. Check how a change from discharge to reinjection, or a mix of both, is reflected in the unit’s IBAMA licence and in its CONAMA 393 monitoring.
For a wider look at treatment options and costs, see our guides to produced water treatment technologies and produced water treatment cost per barrel. For other Brazilian industrial water work, see our Brazil page, and for how discharge rules compare across regions, our brine discharge regulations guide.
When independent advice helps
Writing the produced water basis for a new or converted FPSO, before the package is bought.
Comparing package bids whose guarantees, test methods and inlet assumptions differ.
Investigating TOG exceedances or rising chemical use on an operating unit.
Screening reinjection for a field where discharge is the current route.
Technical due diligence on an asset purchase or financing where produced water performance and monitoring history matter.
Bring daily TOG results with the method used, flows, separator and hydrocyclone conditions, the chemicals dosed, and full water analyses including calcium, barium, strontium, sulfate, bicarbonate, pH and dissolved CO2. Our free Water Analysis Validator checks charge balance and ion sum against TDS, and our Industrial Wastewater Scaling and Concentration Tool gives a first look at scaling risk.
Before you buy or rebid a produced water package
A supplier guarantee of “29 ppm maximum” allows your monthly average to sit at the limit before the first upset, so the time for an independent check is before the package is bought, when bids are compared, or when TOG results start to drift. Book time for a call, send the bid documents and TOG history via the consultation page, or see our advisory and due diligence service for asset reviews.
Written by the Brine Consulting advisory team. The Brine Consulting advisory practice includes Steve Coffee, a senior produced water expert and global oil and gas advisor with more than 30 years of experience in produced water treatment, hydrocyclones, sand management, water reuse, and upstream system optimization, and Dr. Tijjani El-Badawy, an interdisciplinary water, energy, and sustainability specialist with expertise in produced water desalination, critical mineral recovery, circular economy strategy, contamination mapping, and integrated water management. Meet our experts.