If you are looking for water treatment consultants for an Australian industrial site with a salty stream, ask first whether they can tell you where that salt is allowed to go. RO reject, cooling tower blowdown, ion exchange regenerant and process brine are each limited by the outlet they end up in, and the outlet decides the plant. Many of the consultants an Australian search returns work mainly for councils, water utilities and environmental approvals: useful work, but a different job.
Brine Consulting is an independent industrial water advisory firm in Amsterdam, and we sell no treatment equipment, so the outlet is the first thing we test rather than the last. Australian sites work with us remotely or through a defined engagement: you share the water data, the licence or trade waste conditions and any offers on the table, and we return a view on the realistic outlets and the treatment basis. We have no Australian office; applications and approvals stay with you and your local engineers.
In Australia, the disposal route sets the treatment target
The first question for a saline stream is not which technology to buy. It is which outlet you have, and who controls it. In Australia that answer changes from state to state and, for sewer discharge, from one treatment plant catchment to the next.
| Where the water goes | Who decides | What it means for a saline stream |
|---|---|---|
| Surface water or land, NSW | NSW EPA, through an environment protection licence for activities listed in Schedule 1 of the Protection of the Environment Operations Act 1997 (EPA guide to licensing) | Licences can carry monitoring conditions, pollution reduction programs and load-based fees for assessable pollutants |
| Surface water or land, Victoria | EPA Victoria, through licences, permits and registrations for activities in Schedule 1 of the Environment Protection Regulations 2021 (EPA Victoria) | The general environmental duty applies at all times: you must minimise risks of harm so far as reasonably practicable, licensed or not |
| Surface water or land, Queensland | Department of the Environment, Tourism, Science and Innovation, through an environmental authority for an environmentally relevant activity under the Environmental Protection Act 1994 (Business Queensland) | Operating a prescribed activity without an environmental authority is an offence |
| Surface water or land, Western Australia | Department of Water and Environmental Regulation, through a works approval and licence for prescribed premises under Part V of the Environmental Protection Act 1986 (WA Government) | A works approval is needed before you build; discharging without a licence or registration is an offence |
| Sewer, Sydney | Sydney Water trade wastewater acceptance standards (acceptance standards, 2026-27 charging year) | Total dissolved solids up to 10,000 mg/L to ocean systems without a discharge limitation, but 500 mg/L where a limitation applies, which may be the case for an inland treatment plant |
| Sewer, Perth | Water Corporation trade waste acceptance criteria (Water Corporation) | Total dissolved solids up to 20,000 mg/L and chloride up to 15,000 mg/L, both also subject to mass limits set by system capacity |
Two things stand out. A factory in Perth and a factory in inland NSW can produce identical RO reject, and one may send it to sewer while the other cannot. And none of these regimes names zero liquid discharge as a requirement. In our view ZLD becomes the answer only when every permitted outlet is closed or too expensive, which is why we test the outlets before anyone prices an evaporator.
A worked example: the same reject water in three places
This is a hypothetical case, chosen to show how the rules above change the engineering. A plant produces 400 m³ a day of RO reject at 8,000 mg/L total dissolved solids, mostly sodium chloride. That is 3,200 kg of dissolved salt every day.
To an ocean-discharging sewer in Sydney. The concentration is under the 10,000 mg/L standard. The load is well above the 100 kg a day at which Sydney Water’s acceptance standards start to apply, so the agreement, charges and any mass conditions still need negotiating. Treatment may be limited to what the trade waste agreement requires.
To an inland catchment where the 500 mg/L limit applies. The stream is 16 times over the limit. Diluting it is not a plan. The site needs another outlet or a concentration step. Taking the reject to 200,000 mg/L in a brine concentrator would leave about 16 m³ a day of brine, still carrying the same 3,200 kg of salt, which now needs a home of its own.
To sewer in Perth. The concentration sits under Water Corporation’s 20,000 mg/L limit. Compliance with the mass limit is checked on the concentration above the first 600 mg/L, so roughly 2,960 kg a day counts against whatever mass the local system can take.
The salt does not disappear in any of these cases; it only moves. Over a year this hypothetical plant produces about 1,170 tonnes of dry salt. For scale, the regional township described in a 2025 Australian Water Association paper expects about 50,000 dry tonnes of salt from its RO reject over 20 years; what salt costs to place inland is covered on our brine management in Australia page.
You can run your own numbers with our free brine mass balance calculator and brine concentration factor calculator. Before you do, check that the water analysis behind them is consistent: the Water Analysis Validator flags charge-balance errors and gaps between the ion sum and reported TDS.
Inland sites: salt is already counted
Away from the coast, salinity is managed as a shared budget, and new salt loads draw scrutiny.
Hunter River, NSW. The Hunter River Salinity Trading Scheme is still running: industries discharge saline water only when the river carries enough fresh water to dilute it, and 200 new salt credits are created every two years to replace expired ones (NSW EPA, checked November 2026). The EPA’s 2012-13 performance report sets out the flow classes: no discharge is allowed at low flow, limited discharge using salt credits is allowed at high flow, and flood-flow discharge is capped by a salinity goal, 900 µS/cm in the lower sector down to Singleton (NSW EPA scheme performance report, 2012-13).
Murray-Darling Basin. South Australia’s salt interception schemes intercepted 299,458 tonnes of salt in 2024-25, helping keep River Murray salinity at Morgan below its 800 EC target (Basin Salinity Management 2030 biennial report).
For an inland plant, that context shapes the realistic options: higher-recovery membranes, a concentrator and crystallizer with a solid salt product, or a disposal route that has been tested with the regulator early. Our guide chapter on evaluating the disposal endpoint first sets out how to compare them, and when MLD is preferable explains why full ZLD is often not the best answer.
Coastal sites, desalination and reuse
On the coast, water security has pushed the big cities toward desalination. Water Corporation’s Southern Seawater Desalination Plant alone produces 100 billion litres a year, on average 30% of Perth’s water supply (Water Corporation). For industrial users, that means drinking-quality water is not a cheap input to waste, and on-site reuse of cooling and process water is worth a proper look. Reuse usually creates a smaller, saltier stream, so it brings you straight back to the disposal question above.
If you are looking for water treatment consultants in Perth, the Water Corporation criteria in the table are the place to start for anything going to sewer.
Mining, coal seam gas and lithium refining
These sectors have their own rules, and this page touches them only briefly. In Queensland, for example, mining resource authorities come from a different department to the one that handles most industrial activities (Business Queensland), and the coal seam gas regime requires proponents to consider beneficial use before disposal and to submit brine management plans (AWA, 2025). If your stream comes from a mine, a gas field or a lithium refinery, say so when you book a call; the questions differ from those on this page.
Mine water has its own pages: mine water treatment in Australia covers Western Australian dewatering, salt lakes and acid drainage, and Queensland mine water treatment covers coal mine releases in the Fitzroy Basin.
Which kind of water treatment consultant do you need?
Water treatment consulting companies in Australia range from environmental and approvals consultancies to process engineers to equipment suppliers that offer “free” design. An EPC water treatment contractor will design, build and guarantee a plant, and you will need one. Local water and wastewater treatment engineering firms handle detailed design, approvals documentation and construction. In our view the gap sits earlier: before an EPC is chosen, someone with no product in the deal should confirm the outlet, the water analysis and the design basis that every bidder will price. Our guide to industrial water treatment companies sets out who does what.
For an Australian site, our part of that work covers:
confirming which outlets your licence, trade waste agreement or catchment rules actually leave open
checking the water analysis and site water balance before any vendor sizes a plant on them
setting MLD, ZLD and recovery options side by side, each with its residual salt and where it goes
reading EPC and vendor offers against that basis, including exclusions and performance guarantees
technical due diligence for lenders, buyers and boards
See our water treatment and ZLD consulting, water reuse and ZLD systems and advisory and due diligence services. For bid reviews, our ZLD vendor proposal checklist lists the checks we run.
Questions to settle before you appoint a consultant
Do we need zero liquid discharge to keep our EPA licence? Not as a rule. State licences set conditions on what you discharge and how you monitor it. ZLD is one way to meet them, in our view usually the most expensive, and it leaves a solid salt residue that needs its own approved destination.
Does it matter that you are not based in Australia? For approvals, yes: applications and licence variations are made by the operator, usually with a local engineering or environmental firm. Our work sits alongside theirs, on the treatment basis, the options and the offers. Most of it runs on data and documents, which is why we can do it remotely.
What to send for a scoping call
A call works best with a recent water analysis, the daily flow, your licence or trade waste conditions and any offers already received. From those we can say which outlets look realistic and whether a fuller independent review is worth commissioning. Book a scoping call, send us your project details or email christos@brineconsulting.com.
Written by the Brine Consulting advisory team. The Brine Consulting advisory practice includes Dr. Christopher Fellows (Part Time Consultant) and Dimitra Aravani (External Advisor – Industrial Wastewater & Water Reuse). Dr. Christopher Fellows is a senior water technology and physical chemistry expert with more than 30 years of combined academic and industrial research experience. A senior industrial wastewater and reuse consultant, Dimitra brings more than a decade of experience delivering water efficiency, reuse, and resource recovery projects for industrial and municipal clients. Meet our experts.