For industrial wastewater treatment in Egypt, what a factory needs depends as much on where its effluent ends up as on what the factory makes. A public sewer, the Nile, an agricultural drain and the sea each fall under a different law, a different licensing body and a different set of limits. Salt is usually the parameter that decides whether conventional treatment is enough or whether a site has to move to reuse, minimal liquid discharge (MLD) or zero liquid discharge (ZLD), because biological treatment does not remove it.

This page sets out which Egyptian rules apply to each discharge route, with the current editions and dates, what that means for sites in Sokhna, Qantara West and the inland industrial cities, and how to tell when ZLD is justified. Brine Consulting is an independent industrial water advisory firm based in Amsterdam that sells no treatment equipment. We advise Egyptian sites remotely or through a defined engagement.

Which Egyptian law applies to your discharge route?

Each route has its own law: Law 93 of 1962 for the sewer, Law 48 of 1982 for the Nile, canals and agricultural drains, and Law 4 of 1994 for the sea, with SCZone licensing on top for any site inside the Suez Canal Economic Zone. The table shows the framework as we found it in November 2026. It is a starting point for a permit discussion, not legal advice; always work from the official Arabic text.

Where the effluent goes Main law Implementing rules in force (latest change found) Licence or approval What the rules say about salt (TDS)
Public sewer or industrial-zone network Law 93 of 1962 Executive regulation as amended by Decree 44 of 2000. Its Article 14 sets limits such as COD 1,100 mg/L and BOD 600 mg/L, and diluting wastewater to meet them is prohibited The sewer operator A 2006 audit of five Alexandria textile companies reported effluents failing Decree 44/2000 on COD and TDS (Mohammed and Mousa). Check the receiving plant’s own acceptance terms too
The Nile, its branches and freshwater canals Law 48 of 1982, amended by Decree-Law 103 of 2015 Ministerial Decree 92 of 2013, amended by Decree 208 of 2018 (published 27 August 2018) Ministry of Water Resources and Irrigation, with the health ministry 1,200 mg/L
Agricultural drains and other non-fresh water Law 48 of 1982 As above. Decree 208/2018 adds a case-by-case study where the receiving water later flows into fresh water Ministry of Water Resources and Irrigation 2,000 mg/L
The sea: Mediterranean, Gulf of Suez, Red Sea Law 4 of 1994, amended by Law 9 of 2009 and Law 105 of 2015 Executive regulations (Prime Minister’s Decree 338 of 1995), most recently amended by Decree 2466 of 2024, which replaced Annex 1 on liquid discharges to the aquatic environment Licensing authority, on the basis of an environmental impact assessment (EIA) and on-site treatment units (Article 70) Set in the 2024 Annex 1. Confirm the current figures from the official text before any design
Any route inside the Suez Canal Economic Zone Law 83 of 2002, amended by Law 27 of 2015 SCZone’s own regulations The SCZone Board, which issues environmental and health and safety licences (SCZone rules) As for the route used

The Article 14 sewer limits and the 1,200 and 2,000 mg/L TDS figures are as tabulated in a 2019 environmental assessment prepared for Egypt’s Holding Company for Water and Wastewater and published by the European Investment Bank. The 2,000 mg/L drain figure also appears as the reference limit in a 2016 study of Port Said’s industrial free zone.

Two points are easy to get wrong:

  • Law 147 of 2021 did not replace Law 48 of 1982. The Water Resources and Irrigation Law (Official Gazette, 16 October 2021) repealed the 1984 Irrigation and Drainage Law. Its Article 34, on drainage outlets into the Nile and waterways, is expressly without prejudice to Law 48 of 1982, and the Nile pollution law remains in force (gazette text).

  • The environment law’s executive regulations have been amended many times. The Egyptian Environmental Affairs Agency (EEAA) lists amending decrees from 2005, 2011, 2012, 2015, 2016, two in 2017 and Decree 2466 of 2024. A design basis that quotes discharge limits from an older edition needs checking.

What the 2024 amendment changed

Prime Minister’s Decree 2466 of 2024 was issued on 7 August 2024 (MELES record). According to the FAOLEX summary, it:

  • replaced Annex 1, the standards for liquid waste discharged to the aquatic environment, and added Annex 1 bis, guidelines for continuous self-monitoring of final discharge indicators;

  • requires an EIA before any project starts, prepared by licensed practitioners, and requires environmental measurements to be made in accredited laboratories;

  • requires facility managers to keep paper and electronic records of environmental impacts, report deviations with corrective actions, and send the agency annual reports on discharge rates and pollutant concentrations.

For an existing plant, the practical consequence is data. A site that has been sampling a few times a year may now need continuous monitoring of its final discharge and a defensible annual record. Gaps in that record are hard to explain once an inspector asks for them.

Sokhna, Qantara West and the inland cities: same effluent, different answers

Location decides which routes are physically available.

  • Ain Sokhna (SCZone, Gulf of Suez coast). For the Sokhna Industrial Zone, SCZone lists a 35,000 m³/day wastewater treatment plant, a 2,000 m³/day portable treatment unit and more than 100,000 m³/day of seawater desalination capacity (SCZone). A coastal site may have a sea route, but it then sits under Articles 69 to 73 of Law 4/1994, including the rule that building within 200 metres of the shoreline needs approval. Wet textile processing is arriving: Infinity Fabric has signed for a spinning, weaving, dyeing and printing plant in the Sokhna Industrial Zone, with operations expected in the third quarter of 2026 (Amwal Al Ghad, 15 October 2025).

  • Qantara West (SCZone, inland of the canal). SCZone reports 31 textile and ready-made garment projects in the zone and a wastewater treatment plant of 60,000 m³/day in two 30,000 m³/day phases (SCZone, 7 August 2025). For a dyehouse here, the question is what the zone plant will accept, especially on salt and colour.

  • Inland cities such as 10th of Ramadan, Sadat City and Borg El Arab. There is no sea. Effluent goes to a sewer network or a drain, so the 2,000 mg/L drain figure or the sewer operator’s terms become the binding limit. Drains are not a soft option: in Port Said’s industrial free zone, the 2016 study measured a mean TDS of 2,523 mg/L in the main drain station effluent against the 2,000 mg/L limit.

Textile wet processing: where salt becomes the problem

Dyeing and finishing use salt, alkali and large volumes of rinse water. Our ZLD in the textile industry guide covers the process and the treatment train; the Egyptian specifics are in the routes above.

Egyptian evidence points the same way. The Alexandria audit found that the one company complying with Decree 44/2000 had closed its dyeing department. Buyer standards are reaching Egyptian mills too: a SwitchMed and UNIDO programme trained staff from 16 Egyptian textile, apparel and carpet manufacturers in wastewater and chemical management to ZDHC guidelines in 2021 (SwitchMed). In Sadat City, Quartet Textile’s 3,500 m³/day treatment plant won EU grant support in 2022 under a programme co-financed by the EIB, AFD and KfW (Afrik21).

One dyehouse, three Egyptian sites: where 6 tonnes of salt a day can go (hypothetical example)

Assume a dyehouse discharges 1,500 m³/day of combined effluent at 4,000 mg/L TDS after biological treatment. That is 6.0 tonnes of dissolved salt a day. It exceeds both the 1,200 mg/L Nile figure and the 2,000 mg/L drain figure, and dilution removes no salt.

A reverse osmosis (RO) step at 75% recovery, with salt passage simplified to 2% of the feed concentration, gives:

Stream Flow (m³/day) TDS (mg/L) Salt (kg/day)
Feed to RO 1,500 4,000 6,000
Permeate, reused in the dyehouse 1,125 about 80 90
RO reject 375 about 15,800 5,910
Reject after a brine concentrator to 200,000 mg/L about 30 200,000 5,910
Crystallizer solids (dry basis, before hydrate water and organics) 0 (solids) solid about 5,900

RO solves the water problem but not the salt problem: almost all 5.9 tonnes a day are still there, in a quarter of the volume. Where they can go depends on the site:

  • In Sokhna, a permitted sea route under Law 4/1994 may take the 375 m³/day reject, which makes MLD with a marine outfall worth comparing against ZLD.

  • In Qantara West, the reject goes to the zone plant only if the operator accepts that salt load. If not, the site is heading for evaporation.

  • At an inland city site, neither the Nile nor a drain can take a 15,800 mg/L stream. A brine concentrator evaporates about 345 m³/day of that water and a crystallizer most of the remaining 30, leaving roughly 5.9 tonnes a day of mixed salts. Those salts become waste under the Waste Management Law described below.

Run your own numbers with our brine concentration factor calculator and brine mass balance calculator. The figures above are illustrative, not a design.

Is ZLD mandatory in Egypt?

No. We found no Egyptian law or decree, as of November 2026, that makes ZLD mandatory for textile plants or industry in general. ZLD becomes the answer when the endpoint forces it. Start with the disposal endpoint, not the technology.

ZLD tends to be justified when:

  • the only routes are inland, capped on TDS, and the sewer operator will not take the reject;

  • water is expensive or scarce enough that recovering most of it pays back;

  • an export customer or lender requires it.

MLD is usually the better first look when:

  • a licensed sea route exists, as it may in Sokhna;

  • the zone treatment plant can accept a concentrated stream under agreed terms;

  • the salts would end up in a hazardous waste landfill at high cost.

The salt endpoint deserves the same attention as the water. Egypt’s Waste Management Law 202 of 2020 and its executive regulations (Prime Minister’s Decree 722 of 2022) govern disposal. Decree 1113 of 2024, issued in April 2024, redefined hazardous waste landfills around required systems such as double bottom liners, leachate treatment and leak detection (Chambers summary). Confirm with the regulator how your mixed salts will be classified before you buy a crystallizer. Our MLD vs ZLD screener gives a quick first view.

What drives the cost. In our view three numbers decide most of a ZLD or MLD bill in Egypt: the volume that still reaches thermal evaporation after RO, the hardness and silica that limit how far RO can go before scaling, and the price of disposing of the mixed salts once they are classified. Our guides to ZLD cost and evaporator cost set out typical drivers. Fix the discharge route and the salt classification before you compare bids, otherwise each supplier prices a different plant; our note on comparing ZLD consultants covers how to judge advisers too.

Where an independent review helps on an Egyptian project

We advise Egyptian sites remotely or through a defined engagement, from the data the site shares. Because Brine Consulting sells no treatment equipment, the review is about the route and the salt, not about a product. The decisions it usually helps settle here:

  • for a Sokhna or Qantara West tenant, whether to rely on the zone treatment plant, a licensed sea route or its own treatment, and what each means for the salt;

  • a whole-site water balance for a dyehouse, showing how far reuse can go before the reject needs evaporation, with the water analyses behind it checked;

  • whether an existing permit still matches the August 2024 Annex 1, and what continuous self-monitoring of the final discharge will require;

  • whether competing MLD or ZLD offers rest on the same discharge route and salt classification, reviewed against our ZLD vendor proposal checklist.

Before a first call, gather a year of effluent flows, two or three full ion analyses rather than TDS alone, the current discharge route and licence, and any letters from the regulator or zone operator. More on our water treatment and ZLD consulting and water reuse and ZLD systems services. For desalination plants on the Red Sea coast, see desalination brine disposal in Egypt; for sites in Morocco, our page on industrial wastewater treatment in Morocco; for the wider region, our North Africa page.

Two questions on blending and SCZone approvals

Can we blend treated effluent with cleaner water to meet a TDS limit? Not on the sewer route, where dilution is prohibited, and it adds no salt removal on any route. Any plan that relies on blending should be confirmed with the licensing authority in writing.

Who approves the environmental study for a project in SCZone? SCZone’s Board issues environmental licences for projects in the zone, and SCZone asks applicants to describe their project’s environmental impact. Check the current procedure with the zone’s one-stop shop at the start.

Before you choose between an outfall, the zone plant and ZLD

Those three answers lead to very different plants, and an offer built on the wrong discharge route is costly to correct once the licence application is filed. If you have a route in mind, or offers that assume different ones, book a scoping call or send us your project details with the current licence.

Written by the Brine Consulting advisory team. The Brine Consulting advisory practice includes Osis G. Kalache, P.Eng., a senior consultant in wastewater process engineering and optimization with more than 17 years of experience in industrial and conventional wastewater treatment, and Cesar J.M. Chu Ortega, a part-time consultant, water-tech strategist and electrocoagulation specialist with expertise in reuse, ZLD, membrane system optimization and industrial wastewater treatment, whose work spans textile, chemical and municipal applications. Meet our experts.

Questions about your site's water or brine?

Tell us briefly what you are working on and one of our experts will get back to you.